Safety Incidents OSHA Severe Injury Reports · 2015–2025
2,004,209Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: SHARPCO, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of SHARPCO, INC. in 8770 FRONTAGE ROAD, MONROE, LA 71202 (NAICS 332312). OSHA activity number 346390867.

Watch Sharpco, INC. — free Get an email when a new federal OSHA severe-injury report for Sharpco, INC. is published. One employer, no account, unsubscribe in one click.
Establishment
SHARPCO, INC.
Site address
8770 FRONTAGE ROAD
City
MONROE
State
LA
ZIP
71202
Mailing
8770 FRONTAGE ROAD, MONROE, LA 71202
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332312
Employees
4
Ownership type
A

3 citations on file for this inspection.

1910.212 A01

Serious Gravity 5 4 instances 4 exposed
Issued
Abate by
Penalty
Initial $3572.00 · Current $2143.00 Reduced
29 CFR  1910.212(a)(1):One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks:  On or about December 14, 2022, employees were utilizing machines and equipment without machine guarding: A. Daito band saw B. MSC table saw C. Lagun drill press D. Supermax horizontal drill
Recent events (2)
  • — I (S) $2143.2
  • — Z (S) $3572

1910.147 C04 II

Other-than-serious 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $501.00 · Current $301.00 Reduced
29 CFR 1910.147(c)(4)(ii): The procedures shall clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, the following:   (A) A specific statement of the intended use of the procedure;  (B) Specific procedural steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy; (C) Specific procedural steps for the placement, removal and transfer of lockout devices or tagout devices and the responsibility for them; and (D) Specific requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control measures.  On or about December 14, 2022, the employer failed to properly develop clear and specific procedures within Sharpco Inc's LO/TO program.
Recent events (2)
  • — I (O) $300.6
  • — Z (O) $501

1910.147 C06 II

Other-than-serious 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $501.00 · Current $301.00 Reduced
29 CFR  1910.147(c)(6)(ii): The employer shall certify that the periodic inspections have been performed. The certification shall identify the machine or equipment on which the energy control procedure was being utilized, the date of the inspection, the employees included in the inspection, and the person performing the inspection.  On or about December 14, 2022, the employer failed to certify periodic inspection were being performed.
Recent events (2)
  • — I (O) $300.6
  • — Z (O) $501

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346390867.