1,224,460Inspections Most recent open 2026-07-13 Last loaded 2026-07-16
Safety Incidents OSHA Severe Injury Reports · 2015–2025

OSHA Inspection: ALLIED MACHINED PRODUCTS CORP.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ALLIED MACHINED PRODUCTS CORP. in 4 WESTEC DRIVE, AUBURN, MA 01501 (NAICS 332721). OSHA activity number 346548555.

Watch Allied Machined Products Corp. — free Get an email when a new federal OSHA severe-injury report for Allied Machined Products Corp. is published. One employer, no account, unsubscribe in one click.
Site address
4 WESTEC DRIVE
City
AUBURN
State
MA
ZIP
01501
Mailing
4 WESTEC DRIVE, AUBURN, MA 01501
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332721
Employees
52
Ownership type
A

2 citations on file for this inspection.

1910.147 C04 I

Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $10938.00 · Current $6187.00 Reduced
29 CFR  1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section:   4 Westec Dr, Auburn, MA:  On March 7, 2023 and at times prior,  the employer had not developed or documented any machine-specific energy control procedures to protect employees and outside contractors during maintenance and servicing activities.  *Abatement Notes:  Energy control procedures are required to be: - Documented for all multiple-energy source machines including all CNC machines. - Followed by employees and outside contractors  *Abatement notes are intended only to provide clarity regarding existing requirements under the law or agency policies.  Abatement notes do not create (or diminish) legal obligations under the Occupational Safety and Health Act
Recent events (3)
  • — P (S) $6187
  • — I (S) $6187
  • — Z (S) $10938

1910.147 C06 I

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $7813.00 · Current $4813.00 Reduced
29 CFR  1910.147(c)(6)(i):The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: 4 Westec Dr, Auburn, MA:  On March 7, 2023 and for numerous years prior, the employer had not performed a comprehensive periodic inspection of energy control procedures including, but not limited to the procedure for the Doosan Puma machine, at least annually, to verify that each procedure was adequate and being used properly by employees.   *Abatement Notes:   A periodic inspection shall include the following elements:  -  Appointment of an authorized employee to inspect each unique procedure for inaccuracies during an actual energy control task   -  A review by inspector with each authorized employee, of that employee's responsibilities under each energy control procedure they are authorized to use -  Certification that the periodic inspections have been performed by identifying the machines or equipment on which the energy control procedures were being utilized, the dates of the inspections, the employees included in the inspections, and the persons performing the inspections *Abatement notes are intended only to provide clarity regarding existing requirements under the law or agency policies.  Abatement notes do not create (or diminish) legal obligations under the Occupational Safety and Health Act
Recent events (3)
  • — P (S) $4813
  • — I (S) $4813
  • — Z (S) $7813

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346548555.