UXBRIDGE, MA —
OSHA Inspection: PRECISION ENGINEERING, L.L.C.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of PRECISION ENGINEERING, L.L.C. in 29 INDUSTRIAL PARK DR PO BOX 546, UXBRIDGE, MA 01569 (NAICS 332322). OSHA activity number 346610595.
Where did this inspection happen?
- Establishment
- PRECISION ENGINEERING, L.L.C.
- Site address
- 29 INDUSTRIAL PARK DR PO BOX 546
- City
- UXBRIDGE
- State
- MA
- ZIP
- 01569
- Mailing
- 29 INDUSTRIAL PARK DR PO BOX 546, UXBRIDGE, MA 01569
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332322
- Employees
- 29
- Ownership type
- A
Citations
2 citations on file for this inspection.
1910.147 C04 II D
- Issued
- Abate by
- Penalty
- Initial $7813.00 · Current $1500.00 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(ii)(D):The energy control procedures did not clearly and specifically outline the requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices and other energy control measures. 29 Industrial Dr., Uxbridge, MA: On and before April 4, 2023, energy control procedures, for machines including but not limited to the Laser Punch ELMK, did not specifically state which button(s) to push to verify that the energy sources were actually isolated.
Recent events (2)
- — I (O) $1500
- — Z (S) $7813
1910.147 C06 I
- Issued
- Abate by
- Penalty
- Initial $6250.00 · Current $0.00 Reduced
General-duty citation text
29 CFR 1910.147(c)(6)(i):The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: 29 Industrial Dr., Uxbridge, MA: On and for a three years before April 4, 2023, the employer had not performed a comprehensive periodic inspection of energy control procedures including, but not limited to the Laser Punch ELMK machine, at least annually to verify that each procedure was adequate and being properly used by employees. *Abatement Notes: A periodic inspection shall include the following elements: - Appointment of an authorized employee to inspect each unique procedure for inaccuracies during an actual energy control task - A review by inspector with each authorized employee, of that employee's responsibilities under each energy control procedure they are authorized to use - Certification that the periodic inspections have been performed by identifying the machines or equipment on which the energy control procedures were being utilized, the dates of the inspections, the employees included in the inspections, and the persons performing the inspections *Abatement notes are intended only to provide clarity regarding existing requirements under the law or agency policies. Abatement notes do not create (or diminish) legal obligations under the Occupational Safety and Health Act.
Recent events (2)
- — I (O) $0
- — Z (S) $6250
More inspections in this industry (NAICS 332322)
CASTLE ROCK, CO—2026-07-10
MASTER MAGNETICS, INC.
PITTSBURG, KS—2026-07-09
PROGRESSIVE PRODUCTS INC
NEW ROCHELLE, NY—2026-07-09
HEFTI HARBOR ELEC FAB & TOOLS
LAKEWOOD, WA—2026-07-08
WA317992020 - KRUEGER SHEET METAL CO
SOUTHAMPTON, MA—2026-07-07
LYMAN SHEET METAL CO., INC
More inspections in MA
WORCESTER, MA—2026-07-10
QUINSIGAMOND COMMUNITY COLLEGE
FITCHBURG, MA—2026-07-10
KELLEY WOOD PRODUCTS, INC.
EVERETT, MA—2026-07-10
HORIZON RETAIL CONSTRUCTION INC
NORTON, MA—2026-07-09
DYNAMIC RESIDENTIAL ROOF MARKETING, LLC
NORTON, MA—2026-07-09
LM GENERAL CONSTRUCTION INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346610595.