Safety Incidents OSHA Severe Injury Reports · 2015–2025
2,004,209Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: PRECISION ENGINEERING, L.L.C.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of PRECISION ENGINEERING, L.L.C. in 29 INDUSTRIAL PARK DR PO BOX 546, UXBRIDGE, MA 01569 (NAICS 332322). OSHA activity number 346610595.

Watch Precision Engineering, L.L.C. — free Get an email when a new federal OSHA severe-injury report for Precision Engineering, L.L.C. is published. One employer, no account, unsubscribe in one click.
Site address
29 INDUSTRIAL PARK DR PO BOX 546
City
UXBRIDGE
State
MA
ZIP
01569
Mailing
29 INDUSTRIAL PARK DR PO BOX 546, UXBRIDGE, MA 01569
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332322
Employees
29
Ownership type
A

2 citations on file for this inspection.

1910.147 C04 II D

Other-than-serious Gravity 5 1 instance 17 exposed
Issued
Abate by
Penalty
Initial $7813.00 · Current $1500.00 Reduced
29 CFR  1910.147(c)(4)(ii)(D):The energy control procedures did not clearly and specifically outline the requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices and other energy control measures. 29 Industrial Dr., Uxbridge, MA:  On and before April 4, 2023, energy control procedures, for machines including but not limited to the Laser Punch ELMK, did not specifically state which button(s) to push to verify that the energy sources were actually isolated.
Recent events (2)
  • — I (O) $1500
  • — Z (S) $7813

1910.147 C06 I

Other-than-serious Gravity 5 1 instance 17 exposed
Issued
Abate by
Penalty
Initial $6250.00 · Current $0.00 Reduced
29 CFR  1910.147(c)(6)(i):The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: 29 Industrial Dr., Uxbridge, MA:  On and for a three years before April 4, 2023, the employer had not performed a comprehensive periodic inspection of energy control procedures including, but not limited to the Laser Punch ELMK machine, at least annually to verify that each procedure was adequate and being properly used by employees. *Abatement Notes:  A periodic inspection shall include the following elements:  - Appointment of an authorized employee to inspect each unique procedure for inaccuracies during an actual energy control task  - A review by inspector with each authorized employee, of that employee's responsibilities under each energy control procedure they are authorized to use - Certification that the periodic inspections have been performed by identifying the machines or equipment on which the energy control procedures were being utilized, the dates of the inspections, the employees included in the inspections, and the persons performing the inspections *Abatement notes are intended only to provide clarity regarding existing requirements under the law or agency policies. Abatement notes do not create (or diminish) legal obligations under the Occupational Safety and Health Act.
Recent events (2)
  • — I (O) $0
  • — Z (S) $6250

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346610595.