WILLIMANTIC, CT —
OSHA Inspection: DOWNES CONSTRUCTION COMPANY, LLC
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of DOWNES CONSTRUCTION COMPANY, LLC in 355 HIGH STREET, WILLIMANTIC, CT 06226 (NAICS 238990). OSHA activity number 346617699.
Where did this inspection happen?
- Establishment
- DOWNES CONSTRUCTION COMPANY, LLC
- Site address
- 355 HIGH STREET
- City
- WILLIMANTIC
- State
- CT
- ZIP
- 06226
- Mailing
- 200 STANLEY STREET, NEW BRITAIN, CT 06051
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238990
- Employees
- 6
- Ownership type
- A
Citations
2 citations on file for this inspection.
1926.34 B
- Issued
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.34(b): Exits and access to exits were not marked by a readily visible sign: 355 High Street, Willimantic, CT, Windham High School construction project: On or about April 5, 2023, employees working in the gymnasium, the exit sign were not marked by a readily available visible sign subjecting employees to prolonged fire exposure and the byproducts of combustion.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1926.403 B02
- Issued
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.403(b)(2): Listed, labeled, or certified equipment was not installed and used in accordance with instructions included in the listing, labeling, or certification: A) 355 High Street, Willimantic, CT, Windham High School construction project: On or about April 5, 2023, employees were using a relocatable power tap to energized multiple pieces of cord and plug equipment. The relocatable power tap was connected to a temporary outlet that was not rated for use on temporary wiring. The relocatable power tap was UL listed for household use only. B) 355 High Street, Willimantic, CT, Windham High School construction project: On or about April 5, 2023, temporary electrical wiring used in the gymnasium were fastened from one point to the next at approximate intervals of 40 feet. The NEC Article 334 requires that temporary wiring be secured at intervals not to exceed 4.5 feet.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at DOWNES CONSTRUCTION COMPANY, LLC
BRISTOL, CT—2020-12-07 00:00:00
DOWNES CONSTRUCTION COMPANY, LLC
MANCHESTER, CT—2019-03-20 00:00:00
DOWNES CONSTRUCTION COMPANY, LLC.
BETHEL, CT—2018-03-06 00:00:00
DOWNES CONSTRUCTION COMPANY, LLC
MANCHESTER, CT—2017-04-03 00:00:00
DOWNES CONSTRUCTION COMPANY, LLC.
PUTNAM, CT—2014-03-11 00:00:00
DOWNES CONSTRUCTION COMPANY, LLC
View DOWNES CONSTRUCTION COMPANY, LLC's full OSHA safety record →
More inspections in this industry (NAICS 238990)
NEW YORK, NY—2026-07-09
PALM INDUSTRIES LLC
NEW YORK, NY—2026-07-09
PALM INDUSTRIES LLC
EL PASO, TX—2026-07-09
RM CRANE & RIGGING LLC.
LAKEWOOD, WA—2026-07-08
WA317992018 - HARMON INC DBA HARMON SERVICE GLAZING INC
VICTOR, NY—2026-07-08
DIMARCO CONSTRUCTORS
More inspections in CT
BRIDGEPORT, CT—2026-07-10
WRR, INC.
BERLIN, CT—2026-07-10
MMF CONSTRUCTION LLC
NAUGATUCK, CT—2026-07-08
WHITING-TURNER LCT2 JOINT VENTURE
SOMERS, CT—2026-07-08
F&G RECYCLING LLC
STAMFORD, CT—2026-07-07
FAIRFIELD AVENUE MAINTENANCE COMPANY, INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346617699.