Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,214Inspections Most recent open 2026-07-16 Last loaded 2026-07-20

OSHA Inspection: NORTH CONSTRUCTION INC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of NORTH CONSTRUCTION INC in 22 PINE STREET, AMHERST, NH 03031 (NAICS 238160). OSHA activity number 346717226.

Watch North Construction INC — free Get an email when a new federal OSHA severe-injury report for North Construction INC is published. One employer, no account, unsubscribe in one click.
Site address
22 PINE STREET
City
AMHERST
State
NH
ZIP
03031
Mailing
6 EATON STREET APT 1, BROCKTON, MA 02301
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
238160
Employees
9
Ownership type
A

9 citations on file for this inspection.

1903.19 C01

Other-than-serious 5 instances 5 exposed
Issued
Abate by
Penalty
Initial $376.00 · Current $376.00
29 CFR 1903.19(c)(1): Within 10 calendar days after the abatement date, the employer must certify to OSHA (the Agency) that each cited violation has been abated, except as provided in paragraph (c)(2) of this section:  The employer did not furnish the abatement required for citations issued within 10 calendar days for Citation No.1 Item No(s). 1a, 1b, 1c, 3, and 5 nor did they respond to the progress report letter sent October 11, 2023.
Recent events (1)
  • — Z (O) $376

1903.19 D01

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $376.00 · Current $376.00
29 CFR  1903.19(d)(1): The employer must submit to the Agency, along with the information on abatement certification required by paragraph (c)(3) of this section, documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required.   The employer did not furnish the abatement required for citations issued within 10 calendar days for Citation No. 1 Item No(s). 4 nor did they respond to the progress report letter sent October 11, 2023.
Recent events (1)
  • — Z (O) $376

1926.20 B01

Serious Gravity 5 1 instance 9 exposed
Issued
Abate by
Penalty
Initial $3349.00 · Current $3349.00
29 CFR  1926.20(b)(1):The employer did not initiate and maintain such programs as may be necessary to comply with this part.  Site- Employees were exposed to fall, struck by, and electrical hazards where the employer did not initiate and maintain a safety program.
Recent events (1)
  • — Z (S) $3349

1926.20 B02

Serious Gravity 5 1 instance 9 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1926.20(b)(2): The employer did not initiate and maintain programs which provided for frequent and regular inspections of the job site, materials and equipment to be made by a competent person(s)   Site- Employees were exposed to fall, struck by, and electrical hazards where the employer did not provide inspections of the worksite conducted by a competent person.
Recent events (1)
  • — Z (S) $0

1926.503 A01

Serious Gravity 5 1 instance 7 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1926.503(a)(1): The employer did not provide a training program for each employee who might be exposed to fall hazards:   Site- Employees exposed to a fall hazard while working from the roof were not provided with fall protection training from the employer.
Recent events (1)
  • — Z (S) $0

1926.100 A

Serious Gravity 5 1 instance 3 exposed
Issued
Penalty
Initial $3349.00 · Current $3349.00
29 CFR  1926.100(a): Employees were not protected by protective helmets while working in areas where there was a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns:   Site- Employees were not protected from over head struck by injuries where the employer did not require the wearing of head protection.
Recent events (1)
  • — Z (S) $3349

1926.416 A01

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $3349.00 · Current $3349.00
29 CFR  1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means:   Site- Employees working from the roof without fall protection where not protected from electrical shock where the electrical service for the building was not insulated or de-energized.
Recent events (1)
  • — Z (S) $3349

1926.501 B13

Serious Gravity 10 1 instance 7 exposed
Issued
Abate by
Penalty
Initial $4688.00 · Current $4688.00
29 CFR  1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):    Site- Employees working from the roof were exposed to a fall of approximately 18 feet where fall protection was not utilized.
Recent events (1)
  • — Z (S) $4688

1926.1051 A

Serious Gravity 5 1 instance 7 exposed
Issued
Abate by
Penalty
Initial $3349.00 · Current $3349.00
29 CFR  1926.1051(a): Stairways or ladders were not provided at all personnel points of access where there was a break in elevation of 19 inches (48 cm) or more, and no ramp, runway, sloped embankment, or personnel hoist was provided:  Site- Employees were exposed to a fall hazard where a RGC material hoist was used as a ladder to access the roof.
Recent events (1)
  • — Z (S) $3349

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346717226.