YONKERS, NY —
OSHA Inspection: MDH INC.
Unprogrammed Other inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Other safety inspection of MDH INC. in 56 PROSPECT ST., YONKERS, NY 10701 (NAICS 238990). OSHA activity number 347193906.
Where did this inspection happen?
- Establishment
- MDH INC.
- Site address
- 56 PROSPECT ST.
- City
- YONKERS
- State
- NY
- ZIP
- 10701
- Mailing
- 1659 RALPH AVE., BROOKLYN, NY 11236
What kind of inspection was it?
- Inspection type
- Unprogrammed Other (I)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238990
- Employees
- 5
- Ownership type
- A
Citations
4 citations on file for this inspection.
1926.451 B01
- Issued
- Penalty
- Initial $4688.00 · Current $4688.00
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows: location: exterior of building, Prospect St. & Hawthorne Ave. on or about: 7/12/23 a) The employer did not ensure that all working levels of the tubular welded frame scaffold used by employees were fully planked. The employees were exposed to a fall of 60 feet. location: exterior of building, Prospect St. & Hawthorne Ave. on or about: 7/12/23 b) The employer did not ensure that all working levels of the tubular welded frame scaffold used by employees were fully planked. Employees were working from the crossbraces. The employees were exposed to a fall of 60 feet. location: exterior of building, Prospect St. & Hawthorne Ave. on or about: 7/12/23 c) The employer did not ensure that all working levels of the tubular welded frame scaffold used by employees were fully planked. Employees were working from the frames themselves. The employees were exposed to a fall of 60 feet. NOTE: Because abatement of this violation is already documented in the inspection casefile, the employer need not submit certification or documentation of abatement for this violation as normally required by 29 CFR 1903.19.
Recent events (1)
- — Z (S) $4688
1926.451 E01
- Issued
- Penalty
- Initial $4688.00 · Current $4688.00
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Crossbraces were used as a means of access: location: exterior of building, Prospect St. & Hawthorne Ave. on or about: 7/12/23 a) Employees were working on a tubular welded frame scaffold. The employees were not provided with adequate access. The employees were climbing the walk through frames and crossbraces. NOTE: Because abatement of this violation is already documented in the inspection casefile, the employer need not submit certification or documentation of abatement for this violation as normally required by 29 CFR 1903.19.
Recent events (1)
- — Z (S) $4688
1926.501 B01
- Issued
- Penalty
- Initial $3349.00 · Current $3349.00
General-duty citation text
29 CFR 1926.501(b)(1):Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems: location: Northeast corner of building 0n or about: 7/12/23 a) An employee, who was working at the edge of the building, was not provided with adequate fall protection. The midrail was missing. The employee was exposed to a fall of 60 feet. NOTE: Because abatement of this violation is already documented in the inspection casefile, the employer need not submit certification or documentation of abatement for this violation as normally required by 29 CFR 1903.19.
Recent events (1)
- — Z (S) $3349
1926.451 G01
- Issued
- Penalty
- Initial $31252.00 · Current $31252.00
General-duty citation text
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet (3.1 m) above a lower level was not protected from falling to that lower level: location: exterior of building, Prospect St. & Hawthorne Ave. on or about: 7/12/23 a) Employees, installing netting on a tubular welded frame scaffold, were not protected from falling. The employees were exposed to a fall of 60 feet. NOTE: Because abatement of this violation is already documented in the inspection casefile, the employer need not submit certification or documentation of abatement for this violation as normally required by 29 CFR 1903.19.
Recent events (1)
- — Z (W) $31252
More inspections in this industry (NAICS 238990)
ZEPHYRHILLS, FL—2026-07-14
PERIMETER SOLUTIONS GROUP FLORIDA, LLC
NEW YORK, NY—2026-07-09
PALM INDUSTRIES LLC
NEW YORK, NY—2026-07-09
PALM INDUSTRIES LLC
EL PASO, TX—2026-07-09
RM CRANE & RIGGING LLC.
LAKEWOOD, WA—2026-07-08
WA317992018 - HARMON INC DBA HARMON SERVICE GLAZING INC
More inspections in NY
MAYVILLE, NY—2026-07-16
MAYVILLE VILLAGE DPW
NEW HYDE PARK, NY—2026-07-16
NORTH HEMPSTEAD TN MICHAEL J TULLY PARK
CONESUS, NY—2026-07-16
CONESUS TN HIGHWAY DEPT
COMSTOCK, NY—2026-07-15
NYSDOCCS WASHINGTON CORRECTIONAL FACILITY
BALDWINSVILLE, NY—2026-07-15
LYSANDER TOWN HIGHWAY DEPARTMENT
Source