LAKE BLUFF, IL —
OSHA Inspection: PREMIER INDUSTRIAL GROUP LLC DBA HN PRECISION
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of PREMIER INDUSTRIAL GROUP LLC DBA HN PRECISION in 601 SKOKIE HWY, LAKE BLUFF, IL 60044 (NAICS 332710). OSHA activity number 347206989.
Where did this inspection happen?
- Establishment
- PREMIER INDUSTRIAL GROUP LLC DBA HN PRECISION
- Site address
- 601 SKOKIE HWY
- City
- LAKE BLUFF
- State
- IL
- ZIP
- 60044
- Mailing
- 601 SKOKIE HWY, LAKE BLUFF, IL 60044
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332710
- Employees
- 95
- Ownership type
- A
Citations
3 citations on file for this inspection.
1910.147 D
- Issued
- Abate by
- Penalty
- Initial $14518.00 · Current $7219.00 Reduced
General-duty citation text
29 CFR 1910.147(d): The established procedure for the application of energy control (the lockout or tagout procedures) did not cover the actions listed in and was not done in sequence as required by 29 CFR 1910.147(d)(1)-(6): a) Warehouse Valve Guides Area- On January 6, 2024, the employer did not ensure that all the steps outlined in 29 CFR 1910.147(d), required for the control of the hazardous energy sources, are performed. Employees did not de-energize and lockout mechanical hazardous energy sources of the Rotary Machine #1102 prior to unjamming. As a result, the remaining applicable energy control elements, involving machine isolation [1910.147(d)(3)], lock-out/tag-out device application [1910.147(d)(4)], dissipation of residual energy [1910.147(d)(5)], and verification of isolation [1910.147(d)(6)] were not implemented to protect employees from pneumatic and mechanical hazards while employees were unjamming guides. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $7219
- — Z (S) $14518
1910.219 D01
- Issued
- Abate by
- Penalty
- Initial $6222.00 · Current $3521.00 Reduced
General-duty citation text
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o): a) Warehouse Valve Guides Area - On or about January 11, 2024, the employer did not ensure that all pulleys seven feet or less on machines, such as the Hopper 101 and Hopper 803, were enclosed by guards to cover all in-running nip points and moving parts. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $3521
- — Z (S) $6222
1910.219 E03 I
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.219(e)(3)(i): Vertical or inclined belt(s) were not enclosed by guard(s) conforming to the requirements specified at 29 CFR 1910.219(m) and (o): a) Warehouse Valve Guides Area- On or about January 11, 2024, the employer did not ensure that all belts seven or less feet from the ground or working platform on machines such as the Hopper 101 and Hopper 803, were enclosed by guards to cover all inrunning nip points and moving parts. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections in this industry (NAICS 332710)
CAMBRIDGE, MN—2026-07-09
111567 - VISION MACHINE INC
SAINT PAUL, MN—2026-07-09
111558 - ST PAUL MACHINE - DESIGN INC
EVERETT, WA—2026-07-07
WA317991968 - ONOMAC INDUSTRIES INC
SOUTH DEERFIELD, MA—2026-07-07
VISION MACHINING INC
LAKEVILLE, MN—2026-07-02
111518 - KD HOLDING COMPANY INC DBA MEDFAB MANUFACTURING CO
More inspections in IL
BLOOMINGTON, IL—2026-07-13
UNKNOWN CONTRACTOR
GRANITE CITY, IL—2026-07-13
UNITED STATES STEEL CORPORATION
DECATUR, IL—2026-07-10
TILLAMOOK ILLINOIS, LLC
NEW LENOX, IL—2026-07-10
A.D GENERAL CONSTRUCTION LLC
LOCKPORT, IL—2026-07-09
ROBERTO GOMEZ DBA ROBERTO GOMEZ
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347206989.