Safety Incidents OSHA Severe Injury Reports · 2015–2025
2,004,209Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: PRIMEX EXTERIOR SOLUTIONS

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of PRIMEX EXTERIOR SOLUTIONS in 227 PENNSYLVANIA AVENUE, CENTRE HALL, PA 16828 (NAICS 238160). OSHA activity number 347218679.

Watch Primex Exterior Solutions — free Get an email when a new federal OSHA severe-injury report for Primex Exterior Solutions is published. One employer, no account, unsubscribe in one click.
Site address
227 PENNSYLVANIA AVENUE
City
CENTRE HALL
State
PA
ZIP
16828
Mailing
3260 MARSH CREEK ROAD, HOWARD, PA 16841
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
5
Ownership type
A

2 citations on file for this inspection.

1926.501 B13

Serious Gravity 10 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $4839.00 · Current $2700.00 Reduced
29 CFR  1926.501(b)(13):Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):  (a) 227 Pennsylvania Avenue, Centre Hall, PA, Side Roof,  - Employees performed residential roofing activities on a two-story residential roof,  approximately 20 feet above grade with an 8:12 roof pitch, without utilizing any means of fall protection, on or about January 18, 2024.  (b)  227 Pennsylvania Avenue, Centre Hall, PA, Back Roof,  - Employees performed residential roofing activities on a two-story residential roof,  approximately 20 feet above grade with an 6:12 roof pitch, without utilizing any means of fall protection, on or about January 18, 2024.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $2700
  • — Z (S) $4839

1926.1053 B01

Serious Gravity 5 1 instance 5 exposed
Issued
Penalty
Initial $4148.00 · Current $2700.00 Reduced
29 CFR  1926.1053(b)(1):Where portable ladders were used for access to an upper landing surface and the ladder's length allows, the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface being accessed:  (a) 227 Pennsylvania Avenue, Centre Hall, PA, Garage Roof - Employees were performing residential roofing operations on a two story residential roof,  the portable ladder did not extend 3 feet above the upper landing, on or about January 18, 2024.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $2700
  • — Z (S) $4148

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347218679.