On , OSHA opened a federal Agency safety inspection of TRYCON CONCRETE, INC. in 1266 50TH STREET, BROOKLYN, NY 11219 (NAICS 238910). OSHA activity number 347256240.
Where did this inspection happen?
- Establishment
- TRYCON CONCRETE, INC.
- Site address
- 1266 50TH STREET
- City
- BROOKLYN
- State
- NY
- ZIP
- 11219
- Mailing
- 89 FULTON STREET, BRENTWOOD, NY 11717
What kind of inspection was it?
- Inspection type
- Federal Agency (M)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238910
- Employees
- 3
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.651 K01
- Issued
- Abate by
- Penalty
- Initial $6452.00 · Current $6452.00
General-duty citation text
29 CFR 1926.651(k)(1): An inspection of the excavations, the adjacent areas, and protective systems was not conducted by the competent person prior to the start of work and as needed throughout the shift: Location: 1266 50th Street, Brooklyn, NY 11219 On or about: February 2, 2024 (a) The employer did not ensure a competent person capable of identifying existing and predictable hazards conducted inspections throughout the work shift.
Recent events (2)
- — C (S) $6452
- — Z (S) $6452
1926.651 I01
- Issued
- Abate by
- Penalty
- Initial $64529.00 · Current $64529.00
General-duty citation text
29 CFR 1926.651(i)(1): Where the stability of adjoining buildings, walls, or other structures was endangered by excavation operations, support systems such as shoring, bracing or underpinning was not provided to ensure the stability of such structures for the protection of employees. Location: 1266 50th Street, Brooklyn, NY 11219 On or about: February 2, 2024 (a) The employer did not ensure the stability of adjoining walls and structures were not endangered by excavation operations; the employer did not provide any bracing, shoring or support when removing the soil.
Recent events (2)
- — C (W) $64529
- — Z (W) $64529
1926.754 A
- Issued
- Abate by
- Penalty
- Initial $64529.00 · Current $64529.00
General-duty citation text
29 CFR 1926.754(a): Structural stability was not maintained at all times during the erection process. Location: 1266 50th Street, Brooklyn, NY 11219 On or about: February 2, 2024 (a) The employer did not ensure that structural stability was maintained at all times; structural stability was adversely affected following the removal of the support structures such as existing walls.
Recent events (2)
- — C (W) $64529
- — Z (W) $64529
More inspections in this industry (NAICS 238910)
SIOUX FALLS, SD—2026-07-10
SOUKUP CONSTRUCTION, INC.
TUCSON, AZ—2026-07-10
CPX2026XJL680X0074 - JANC EXCAVATING AND CONSTRUCTION, LLC
BAKERSFIELD, CA—2026-07-10
BENCHMARK PIPELINE INC.
LANDISVILLE, PA—2026-07-10
FAIRVIEW DEMOLITION LLC
AMERICAN CANYON, CA—2026-07-10
ENVIRONCARE INTERNATIONAL
More inspections in NY
POUGHKEEPSIE, NY—2026-07-13
MARCO BOARD HOUSE, INC.
CORTLANDT MANOR, NY—2026-07-13
LG BUILDERS INC.
CORTLANDT MANOR, NY—2026-07-13
RJW RENOVATIONS, LLC
HEMPSTEAD, NY—2026-07-13