Safety Incidents OSHA Severe Injury Reports · 2015–2025
4,113,118Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: JEWELL HUDGENS, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of JEWELL HUDGENS, INC. in 1107 N RAGUET ST., LUFKIN, TX 75904 (NAICS 332710). OSHA activity number 347274045.

Watch Jewell Hudgens, INC. — free Get an email when a new federal OSHA severe-injury report for Jewell Hudgens, INC. is published. One employer, no account, unsubscribe in one click.
Site address
1107 N RAGUET ST.
City
LUFKIN
State
TX
ZIP
75904
Mailing
PO BOX 3626, LUFKIN, TX 75904
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332710
Employees
28
Ownership type
A

12 citations on file for this inspection.

1910.178 P01

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $8067.00 · Current $4840.00 Reduced
29 CFR  1910.178(p)(1): Powered industrial truck(s) found to be in need of repair, defective, or in any way unsafe had not been  taken out of service until restored to safe operating condition.  On or about February 12, 2024, on the northeast side of the worksite, and employee was operating a Mitsubishi forklift with the propane tank latch unbuckled while moving wooden pallets stacked with metal pipes.
Recent events (2)
  • — I (S) $4840.2
  • — Z (S) $8067

1910.178 L01 II

Serious Gravity 5 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1910.178(l)(1)(ii): The employer did not ensure that each operator had successfully completed the training required by paragraph (l), except as permitted by paragraph (l)(5), prior to permitting an employee to operate a powered industrial truck.   On or about February 12, 2024,  throughout the facility, employees were required to operate forklifts without having been trained and evaluated.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.179 G01 V

Other-than-serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $4839.00 · Current $2903.00 Reduced
29 CFR  1910.179(g)(1)(v):Pendant control boxes were not clearly marked for identification of functions.  On or about October 4, 2021, in the welding area of the Machine Shop, an employee was operating overhead cranes with pendant control boxes that were not clearly marked.
Recent events (2)
  • — I (O) $2903.4
  • — Z (S) $4839

1910.212 A03 II

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $11292.00 · Current $6775.00 Reduced
29 CFR  1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s).  On or about February 12, 2024, in the Machine Shop, a LeBlond 24" Regal Thru-Spindle Lathe was being operated without a point of operation guard, while milling rollers.
Recent events (2)
  • — I (S) $6775.2
  • — Z (S) $11292

1910.254 D09 III

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $6453.00 · Current $3872.00 Reduced
29 CFR  1910.254(d)(9)(iii): Cables with damaged insulation or exposed bare conductors were not replaced.  On or about February 12, 2024, in the welding area of the Machine Shop, the Metal Inert Gas (MIG) welder's conductor cable was split, exposing metal wires, while the worker was welding.
Recent events (2)
  • — I (S) $3871.8
  • — Z (S) $6453

1910.303 B02

Other-than-serious Gravity 5 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $6453.00 · Current $3872.00 Reduced
29 CFR  1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling.  On or about February 12, 2024, along the southwest wall of the Machine Shop, employees were using a drinking fountain that was being powered by an extension cord, in lieu of a standalone power source.
Recent events (2)
  • — I (O) $3871.8
  • — Z (S) $6453

1910.303 G02 II

Other-than-serious Gravity 5 2 instances 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1910.303(g)(2)(ii): In locations where electric equipment was likely to be exposed to physical damage, enclosures or guards were not so arranged and of such strength as to prevent such damage.  On or about February 12, 2024, in the Machine Shop-  Instance A- Small Engine Regal Lathe in Machine shop does not have a cover over the lathe's work lamp.  Instance B- The Milling Machine in Machine shop does not have a cover over the lathe's work lamp.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1910.303 B01 I

Other-than-serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1910.303(b)(1)(i): Electrical equipment was not free from recognized hazards likely to cause death or serious physical harm, in that the employer did not ensure that the electrical equipment had listing or labeling  identifying the purpose for which the breakers and switches were to energize/de-energize.   On or about February 12, 2024, within the Machine Shop, along the southwest wall, an Eaton Breaker Panel that the machine operators used to turn on their machines daily, had unlabeled switches.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1910.305 B01 II

Other-than-serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $6453.00 · Current $0.00 Reduced
29 CFR  1910.305(b)(1)(ii): Unused openings in boxes, cabinets, or fittings were not effectively closed.  On or about February 12, 2024, in the Machine Shop's southwest wall, a breaker box that employees routinely use to energize the Regal Milling Machines had an unused opening in breaker panel.
Recent events (2)
  • — I (O) $0
  • — Z (S) $6453

1910.1200 E01

Serious Gravity 5 1 instance 28 exposed
Issued
Abate by
Penalty
Initial $6453.00 · Current $3872.00 Reduced
29 CFR  1910.1200(e)(1): Employer had not developed or implemented a written hazard communication program which at included the requirements outlined in 29 CFR 1910.1200(e)(1)(i) and (e)(1)(ii).  On or about February 12, 2024, within the Machine Shop, the employer does not have an established and written Hazardous Communication (HAZCOM) Program.
Recent events (2)
  • — I (S) $3871.8
  • — Z (S) $6453

1910.1200 F07

Serious Gravity 5 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1910.1200(f)(7): The alternative method in lieu of affixing labels to individual stationary process containers did not identify the container to which it is applicable and did not convey the information required by 29 CFR 1910.1200(f)(6).  On or about February 12, 2024, throughout the Machine Shop, there were multiple unlabeled spray bottles containing chemical substances-  Instance A. In the Welding Area of the Machine Shop, in the vicinity of EE#1's work area.  Instance B. In the Main Machine Shop, in the vicinity of EE#4's work area.   Instance C. In the Main Machine Shop, in the vicinity of EE#3's work area.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.1200 H01

Serious Gravity 5 1 instance 28 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area.  On or about February 12, 2024, within the Machine Shop, the employer does not have an established and written Hazardous Communication (HAZCOM) Program, that included training on the hazardous materials being handled in the Machine Shop on a daily basis.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347274045.