Safety Incidents OSHA Severe Injury Reports · 2015–2025
4,113,118Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: PR CONTRUCTION INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of PR CONTRUCTION INC. in ARECIBO SHOPPING CENTER CARR.#2 -AVE. JOS? A. CEDE?O, ARECIBO, PR 00612 (NAICS 236220). OSHA activity number 348038787.

Watch PR Contruction INC. — free Get an email when a new federal OSHA severe-injury report for PR Contruction INC. is published. One employer, no account, unsubscribe in one click.
Establishment
PR CONTRUCTION INC.
Site address
ARECIBO SHOPPING CENTER CARR.#2 -AVE. JOS? A. CEDE?O
City
ARECIBO
State
PR
ZIP
00612
Mailing
PO. BOX 1194, CAMUY, PR 00627
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
236220
Employees
5
Ownership type
A

13 citations on file for this inspection.

1910.134 C01

Serious Gravity 5 1 instance 5 exposed
Issued
Penalty
Initial $2125.00 · Current $2125.00
Recent events (1)
  • — Z (S) $2125

1910.1200 E01

Serious Gravity 5 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $2125.00 · Current $2125.00
Recent events (1)
  • — Z (S) $2125

1910.1200 E01 I

Serious Gravity 5 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
Recent events (1)
  • — Z (S) $0

1910.1200 G01

Serious Gravity 5 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
Recent events (1)
  • — Z (S) $0

1910.1200 H01

Serious Gravity 5 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
Recent events (1)
  • — Z (S) $0

1926.26

Serious Gravity 5 1 instance 5 exposed
Issued
Penalty
Initial $2125.00 · Current $2125.00
Recent events (1)
  • — Z (S) $2125

1926.51 F02

Serious Gravity 5 1 instance 5 exposed
Issued
Penalty
Initial $2125.00 · Current $2125.00
Recent events (1)
  • — Z (S) $2125

1926.51 F03 III

Serious Gravity 5 1 instance 5 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
Recent events (1)
  • — Z (S) $0

1926.51 F03 IV

Serious Gravity 5 1 instance 1 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
Recent events (1)
  • — Z (S) $0

1926.403 B02

Serious Gravity 10 1 instance 5 exposed
Issued
Penalty
Initial $3500.00 · Current $3500.00
Recent events (1)
  • — Z (S) $3500

1926.403 I02 I D

Serious Gravity 10 1 instance 5 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
Recent events (1)
  • — Z (S) $0

1926.452 W01

Serious Gravity 5 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $2125.00 · Current $2125.00
Recent events (1)
  • — Z (S) $2125

1926.454 A

Serious Gravity 5 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
Recent events (1)
  • — Z (S) $0

View PR CONTRUCTION INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348038787.