OSHA Inspection: DIAS RESTORATION, INC

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of DIAS RESTORATION, INC in 299 BEACON STREET, BOSTON, MA 02116 (NAICS 238140). OSHA activity number 348093154.

Watch Dias Restoration, INC — free Get an email when a new federal OSHA severe-injury report for Dias Restoration, INC is published. One employer, no account, unsubscribe in one click.
Site address
299 BEACON STREET
City
BOSTON
State
MA
ZIP
02116
Mailing
318 LYNN STREET, MALDEN, MA 02148
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
10
Ownership type
A

2 citations on file for this inspection.

1926.451 A01

Serious Gravity 10 1 instance 10 exposed
Issued
Penalty
Initial $4965.00 · Current $4965.00
29 CFR  1926.451(a)(1):Each scaffold and/or scaffold component was not capable of supporting, without failure, its own weight and at least 4 times the maximum intended load applied or transmitted to it:Note:  Exceptions are provided in paragraphs (a)(2), (a)(3), (a)(4), (a)(5) and (g) of this section.  Location:  Jobsite at 299 Beacon Street, Boston, MA  On or about March 5, 2025 and times prior, workers were exposed to collapse and fall hazards where a scaffold, which had been wrapped with flame retardant weather protection, had not been adequately constructed to withstand the wind loads transmitted to it and collapsed under the wind load.
Recent events (1)
  • — Z (S) $4965

1926.452 C04

Serious Gravity 10 1 instance 10 exposed
Issued
Penalty
Initial $4965.00 · Current $4965.00
29 CFR  1926.452(c)(4):End frames of tubular welded frame scaffolding were not locked together vertically by use of pins or equivalent means in areas where uplift could occur:  Location:  Jobsite at 299 Beacon Street, Boston, MA  On or about March 5, 2025 and times prior, workers were exposed to collapse and fall hazards where a scaffold, which had been enveloped in weather protection was lacking pins connecting the end tubes of the scaffold.  High wind conditions caused the bracing to fail and uplift to occur causing the scaffold to collapse.