Safety Incidents OSHA Severe Injury Reports · 2015–2025
2,004,209Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: DR METAL ROOFING AND CONSTRUCTION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of DR METAL ROOFING AND CONSTRUCTION in 1236 STANTON ST, SHARON, PA 16146 (NAICS 238160). OSHA activity number 348100223.

Watch DR Metal Roofing AND Construction — free Get an email when a new federal OSHA severe-injury report for DR Metal Roofing AND Construction is published. One employer, no account, unsubscribe in one click.
Site address
1236 STANTON ST
City
SHARON
State
PA
ZIP
16146
Mailing
3473 STATE ROUTE 5, CORTLAND, OH 44410
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
238160
Employees
4
Ownership type
A

2 citations on file for this inspection.

1926.501 B13

Serious Gravity 10 2 instances 4 exposed
Issued
Abate by
Penalty
Initial $4965.00 · Current $3000.00 Reduced
29 CFR  1926.501(b)(13):Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):   A.) DR Metal Roofing and Construction, 1236 Stanton Street, Sharon, PA 16146, On or about 3/11/25 and times prior thereto: employees were performing roofing operations on a residential roof at a height of least 11 feet without the benefit of any type of fall protection.  B.) DR Metal Roofing and Construction, 1236 Stanton Street, Sharon, PA 16146, On or about 3/11/25 and times prior thereto: employees were performing re-roofing operations on the roof of a residential detached garage at a height of at least 7 feet without the benefit of any type of fall protection.   ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation.  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement. IN ADDITION, abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic, or video evidence or abatement or other written records.
Recent events (2)
  • — I (S) $3000
  • — Z (S) $4965

1926.1053 B01

Serious Gravity 5 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $2837.00 · Current $1000.00 Reduced
29 CFR  1926.1053(b)(1):Portable ladders were used for access to an upper landing surface and the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface to which the ladder was used to gain access:  A.) DR Metal Roofing and Construction, 1236 Stanton Street, Sharon, PA 16146, On or about 3/11/25 and times prior thereto: the Gorilla brand ladder that was used to access the roof did not extend above the roof line.   ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $1000
  • — Z (S) $2837

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348100223.