WEST WARWICK, RI —
OSHA Inspection: GUILL TOOL & ENGINEERING CO., INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of GUILL TOOL & ENGINEERING CO., INC. in 10 PIKE STREET, WEST WARWICK, RI 02893 (NAICS 333514). OSHA activity number 348113515.
Where did this inspection happen?
- Establishment
- GUILL TOOL & ENGINEERING CO., INC.
- Site address
- 10 PIKE STREET
- City
- WEST WARWICK
- State
- RI
- ZIP
- 02893
- Mailing
- 10 PIKE STREET, WEST WARWICK, RI 02893
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 333514
- Employees
- 71
- Ownership type
- A
Citations
1 citation on file for this inspection.
1910.147 C04 II
- Issued
- Abate by
- Penalty
- Initial $948.00 · Current $664.00 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(ii): Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D): a) Production Floor: On or about 3/18/2025, the lockout/tagout procedures for the DMGU50, did not include the scope, purpose, authorization, rules and techniques to be utilized for lockout/tagout procedures. Energy sources including electrical and pneumatic. b) Production Floor: On or about 3/18/2025, the lockout/tagout procedures for the MORI SEIKI NMV5000D, did not include the scope, purpose, authorization, rules and techniques to be utilized for lockout/tagout procedures. Energy sources including electrical and pneumatic. c) Production Floor: On or about 3/18/2025, the lockout/tagout procedures for the ROBOFIL 330, #175 did not include the scope, purpose, authorization and means to enforce compliance of the lockout/tagout procedures. Energy sources including electrical and pneumatic. d) Production Floor: On or about 3/18/2025, the lockout/tagout procedures for the ROBOFIL 230, #169 did not include the scope, purpose, authorization and means to enforce compliance of the lockout/tagout procedures. Energy sources including electrical and pneumatic.
Recent events (2)
- — I (O) $663.6
- — Z (O) $948
More inspections at GUILL TOOL & ENGINEERING CO., INC.
WEST WARWICK, RI—2023-03-29 00:00:00
GUILL TOOL & ENGINEERING CO., INC.
View GUILL TOOL & ENGINEERING CO., INC.'s full OSHA safety record →
More inspections in this industry (NAICS 333514)
TUCKER, GA—2026-07-08
DEKALB TOOL & DIE, INC
HENDERSONVILLE, TN—2026-06-26
FUQUA TOOL AND DIE, LLC
BLUE ASH, OH—2026-06-24
META MANUFACTURING CORPORATION
BUFFALO, NY—2026-06-12
SHARP TOOLING COMPANY
GERRY, NY—2026-06-10
UNIVERSAL TOOLING CORPORATION
More inspections in RI
NEWPORT, RI—2026-07-10
STEVEN POSTHUMA
MIDDLETOWN, RI—2026-07-10
GREENWOOD INDUSTRIES
JAMESTOWN, RI—2026-07-10
A K I CARPENTRY INC
NARRAGANSETT, RI—2026-07-09
ROGERS CORPORATION
WARWICK, RI—2026-07-09
LESLIE'S POOL SUPPLIES
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348113515.