CONCORD, NH —
OSHA Inspection: REAL PRO BUILDERS CONSTRUCTION INC
Unprogrammed Related inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Related safety inspection of REAL PRO BUILDERS CONSTRUCTION INC in 13 AND 15 SUFFOLK DRIVE, CONCORD, NH 03303 (NAICS 238130). OSHA activity number 348274226.
Where did this inspection happen?
- Establishment
- REAL PRO BUILDERS CONSTRUCTION INC
- Site address
- 13 AND 15 SUFFOLK DRIVE
- City
- CONCORD
- State
- NH
- ZIP
- 03303
- Mailing
- 1 UNIVERSAL STREET APT 7, FRAMINGHAM, MA 01702
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- Employees
- 5
- Ownership type
- A
Citations
6 citations on file for this inspection.
1903.19 C01
- Issued
- Abate by
- Penalty
- Initial $398.00 · Current $0.00 Reduced
General-duty citation text
29 CFR 1903.19(c)(1): Within 10 calendar days after the abatement date, the employer must certify to OSHA (the Agency) that each cited violation has been abated, except as provided in paragraph (c)(2) of this section: The employer did not furnish the abatement required for citations issued within 10 calendar days for Citation No. 1 Item No(s). 1 nor did they respond to the progress report letter sent September 8, 2025. The employer did not furnish the abatement required for citations issued within 10 calendar days for Citation No. 2 Item No(s). 2 and 3 nor did they respond to the progress report letter sent September 8, 2025.
Recent events (2)
- — I (O) $0
- — Z (O) $398
1903.19 D01
- Issued
- Abate by
- Penalty
- Initial $398.00 · Current $0.00 Reduced
General-duty citation text
29 CFR 1903.19(d)(1): The employer must submit to the Agency, along with the information on abatement certification required by paragraph (c)(3) of this section, documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required. The employer did not furnish the abatement required for citations issued within 10 calendar days for Citation No. 2 Item No(s). 1 nor did they respond to the progress report letter sent September 8, 2025.
Recent events (2)
- — I (O) $0
- — Z (O) $398
1926.20 B02
- Issued
- Abate by
- Penalty
- Initial $3547.00 · Current $1700.00 Reduced
General-duty citation text
29 CFR 1926.20(b)(2): The employer did not initiate and maintain programs which provided for frequent and regular inspections of the job site, materials and equipment to be made by a competent person(s) Site- Employees and workers under the control of the employer working at the site were exposed to fall, struck by, trip, and powered industrial truck hazards where the employer did provide for frequent and regular inspections of the worksite conducted by a competent person.
Recent events (2)
- — I (S) $1700
- — Z (S) $3547
1926.501 B13
- Issued
- Abate by
- Penalty
- Initial $4965.00 · Current $0.00 Reduced
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): Site- Workers under the control of the employer that were installing roof sheathing were not protected from falls between approximately 16 feet to the ground and 8 feet to the second floor where fall protection was not utilized.
Recent events (2)
- — I (O) $0
- — Z (S) $4965
1926.502 B01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.502(b)(1): The top edge height of the top rails, or equivalent guardrail system members, was not 42 inches (1.1 m) plus or minus 3 inches (8 cm) above the walking/working level: Site- Employees and workers under the control of the employer working near second floor window openings were not protected from a fall of approximately 9 feet where the bottom sills of the window openings were 22 inches from the floor and no top rail was installed.
Recent events (2)
- — I (O) $0
- — Z (S) $0
1926.1052 C01 I
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.1052(c)(1)(i): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with at least one handrail: Site- Employees and workers under the control of the employer were not protected from trip hazards where the stairways inside each unit, from the first floor to the second floor, did not have handrails.
Recent events (2)
- — I (O) $0
- — Z (S) $0
More inspections at REAL PRO BUILDERS CONSTRUCTION INC
DOVER, NH—2026-07-15
REAL PRO BUILDERS CONSTRUCTION INC
View REAL PRO BUILDERS CONSTRUCTION INC's full OSHA safety record →
More inspections in this industry (NAICS 238130)
FAIRHOPE, AL—2026-07-16
FRANCISCO ARES
WOODHAVEN, MI—2026-07-16
G.J. PERELLI CO., L.L.C.
PHILADELPHIA, PA—2026-07-16
URUS CONSTRUCTION CORPORATION
BERLIN, NJ—2026-07-16
URUS CONSTRUCTION CORPORATION
MERIDIAN, ID—2026-07-15
TRIPLE R CONSTRUCTION LLC
More inspections in NH
PORTSMOUTH, NH—2026-07-15
RODAS CONSTRUCTION CORP
DOVER, NH—2026-07-15
KNOX MARSH DEVELOPMENT LLC
DOVER, NH—2026-07-15
REAL PRO BUILDERS CONSTRUCTION INC
MERRIMACK, NH—2026-07-15
BURGER KING
MILFORD, NH—2026-07-15
R G EXTERIORS, INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348274226.