ERIE, PA —
OSHA Inspection: DAVID MILANO CONSTRUCTION, LLC
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of DAVID MILANO CONSTRUCTION, LLC in 865 EAST 44TH STREET, ERIE, PA 16504 (NAICS 237110). OSHA activity number 348444068.
Where did this inspection happen?
- Establishment
- DAVID MILANO CONSTRUCTION, LLC
- Site address
- 865 EAST 44TH STREET
- City
- ERIE
- State
- PA
- ZIP
- 16504
- Mailing
- 2202 ZIMMERLY ROAD, ERIE, PA 16506
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 237110
- Employees
- 4
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.652 A01
- Issued
- Abate by
- Penalty
- Initial $4965.00 · Current $0.00 Reduced
General-duty citation text
29 CFR 1926.652(a)(1):Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652 (b) or (c). a.) David Milano Construction, LLC., 865 E. 44th Street, Erie, PA 16504 - On or about 8/15/25, and at times prior thereto, an employee was in an excavation without a protective system in place. The excavation collapsed while employees were in the excavation repairing a broken sewer line. The excavation was approximately 8 feet deep and had near vertical walls. ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation. This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement. IN ADDITION, abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic, or video evidence or abatement or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $4965
1926.651 K01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.651(k)(1):Daily inspections of excavations, the adjacent areas, and protective systems were not made by a competent person for evidence of a situation that could have resulted in possible cave-ins, indications of failure of protective systems. a.) David Milano Construction, LLC, 865 E. 44th Street, Erie, PA 16504 - On or about 8/15/25, and at times prior thereto, a competent person for excavations was not onsite to evaluate and control hazards associated with the excavation operations taking place for broken sewer line. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.21 B02
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.21(b)(2): The employer did not instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his/her environment to control or eliminate any hazards or other exposure to illness or injury: a.) David Milano Construction, LLC., 865 E. 44th Street, Erie, PA 16504 - On or about 8/15/25, and at times prior thereto, an employee did not receive training on recognition of unsafe conditions and safe work practices when needing to enter an excavation. In addition, the employee did not have training on the 29 CFR 1926 Subpart P - Trenching and Excavation Standard. The excavation collapsed while an employee was in the excavation repairing a broken sewer line. The excavation was approximately 8 feet deep and had near vertical walls. ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation. This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement. IN ADDITION, abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic, or video evidence or abatement or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections in this industry (NAICS 237110)
CHANDLER, AZ—2026-07-16
PREMIER UNDERGROUND CONSTRUCTION LLC
HIGHLAND PARK, IL—2026-07-16
UNITED PLUMBING AND DRAIN, INC.
CHICAGO, IL—2026-07-15
SUSTAINABLE SEWER & WATER INC.
LAKE FOREST, IL—2026-07-15
GREVERS CORPORATION DBA NORTH SHORE BORING
CHEYENNE, WY—2026-07-15
AZTEC CONSTRUCTION
More inspections in PA
PHILADELPHIA, PA—2026-07-16
URUS CONSTRUCTION CORPORATION
JEFFERSON HILLS, PA—2026-07-16
MARATHON PETROLEUM COMPANY ASPHALT TERMINAL
SMITHFIELD, PA—2026-07-16
CARLISLE CONSTRUCTION MATERIALS
PITTSBURGH, PA—2026-07-15