HOUSTON, TX —
OSHA Inspection: CARLOS MANUEL MEJIA GALDANEZ
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of CARLOS MANUEL MEJIA GALDANEZ in 5821 WINSOME LANE, HOUSTON, TX 77057 (NAICS 238130). OSHA activity number 348686924.
Where did this inspection happen?
- Establishment
- CARLOS MANUEL MEJIA GALDANEZ
- Site address
- 5821 WINSOME LANE
- City
- HOUSTON
- State
- TX
- ZIP
- 77057
- Mailing
- 6122 TIFFANY DRIVE, HOUSTON, TX 77085
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- Employees
- 4
- Ownership type
- A
Citations
5 citations on file for this inspection.
1926.451 C02
- Issued
- Abate by
- Penalty
- Initial $2838.00 · Current $2838.00
General-duty citation text
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation: a) On or about January 10, 2026, at a construction site, employees worked on the Werner PJ-100 pump jack scaffold to install exterior sheathing for Building 11, where vertical poles were missing pole feet or equivalent base plates. b) On or about January 14, 2026, at a construction site, employees used the Werner PJ-100 pump jack scaffold to access the 4th floor of Building 11, where vertical poles were missing pole feet or equivalent base plates.
Recent events (1)
- — Z (S) $2838
1926.451 F07
- Issued
- Abate by
- Penalty
- Initial $2838.00 · Current $2838.00
General-duty citation text
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration: a) On or about January 10, 2026, at building 11 of the new townhome construction, the Werner pump jack scaffold was not erected under the supervision and direction of a competent person qualified in scaffold erection. b) On or about January 14, 2026, at building 11 of the new townhome construction, the Werner pump jack scaffold was not erected under the supervision and direction of a competent person qualified in scaffold erection.
Recent events (1)
- — Z (S) $2838
1926.451 G01 VII
- Issued
- Abate by
- Penalty
- Initial $2838.00 · Current $2838.00
General-duty citation text
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section: a) On or about January 10, 2026, at a construction site, where employees worked on the Werner PJ-100 pump jack scaffold to install exterior sheathing for Building 11, more than 40 feet above the ground, were not protected from falling by a complete guardrail system. b) On or about January 14, 2026, at a construction site, where employees used the Werner PJ-100 pump jack scaffold to access the 4th floor of Building 11, more than 40 feet above the ground, were not protected from falling by a complete guardrail system.
Recent events (1)
- — Z (S) $2838
1926.452 J02
- Issued
- Abate by
- Penalty
- Initial $2838.00 · Current $2838.00
General-duty citation text
29 CFR 1926.452(j)(2): Poles were not secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary: a) On or about January 10, 2026, at a construction site, employees worked on the Werner PJ-100 pump jack scaffold to install exterior sheathing for Building 11 without intermediate bracing. b) On or about January 14, 2026, at a construction site, employees used the Werner PJ-100 pump jack scaffold to access the 4th floor of Building 11 without bottom and intermediate bracing.
Recent events (1)
- — Z (S) $2838
1904.39 A02
- Issued
- Penalty
- Initial $2838.00 · Current $2838.00
General-duty citation text
29 CFR 1904.39(a)(2): The employer did not report an in-patient hospitalization, amputation, or loss of an eye as a result of a work-related incident to OSHA within twenty-four (24) hours. a) On or about January 10, 2026, at a construction site, where a work related in-patient hospitalization of an employee that sustained right hand fracture and severe head injuries was not reported to OSHA within 24 hours.
Recent events (1)
- — Z (O) $2838
More inspections in this industry (NAICS 238130)
FAIRHOPE, AL—2026-07-16
FRANCISCO ARES
WOODHAVEN, MI—2026-07-16
G.J. PERELLI CO., L.L.C.
PHILADELPHIA, PA—2026-07-16
URUS CONSTRUCTION CORPORATION
BERLIN, NJ—2026-07-16
URUS CONSTRUCTION CORPORATION
MERIDIAN, ID—2026-07-15
TRIPLE R CONSTRUCTION LLC
More inspections in TX
WICHITA FALLS, TX—2026-07-16
UNITED RENTALS, INC.
SAN MARCOS, TX—2026-07-16
CASA MECHANICAL SERVICES, LTD.
CLARKSVILLE, TX—2026-07-15
SEQUOIAS TREE EXPERT LLC
EL PASO, TX—2026-07-15
SURE STEEL
CORPUS CHRISTI, TX—2026-07-15
NORTH STAR ENERGY SOLUTIONS LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348686924.