272,276Inspections Most recent open 2026-07-02 Last loaded 2026-07-06
Safety Incidents OSHA Severe Injury Reports · 2015–2025

OSHA Inspection: PRP CONSTRUCTION INC

Follow-up inspection · Safety discipline

On , OSHA opened a follow-up safety inspection of PRP CONSTRUCTION INC in 635 8TH STREET NE, WASHINGTON, DC 20002 (NAICS 000000). OSHA activity number 856237.

Site address
635 8TH STREET NE
City
WASHINGTON
State
DC
ZIP
20002
Inspection type
Follow-up (F)
Scope
No inspection (D)
Discipline
Safety
Advance notice
No
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
1521
Ownership type
A

No citations on file for this inspection. OSHA's citation feed is backfilled in rolling windows; this inspection may have been closed without violations, or its citation rows may not have been ingested yet.

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 856237.