Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: PIONEER HOUSING SYSTEM, INC. - PLANT #1

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of PIONEER HOUSING SYSTEM, INC. - PLANT #1 in 209 GLEN BASS RD, FITZGERALD, GA 31750 (NAICS 000000). OSHA activity number 106451669.

Watch Pioneer Housing System, INC. - Plant #1 — free Get an email when a new federal OSHA severe-injury report for Pioneer Housing System, INC. - Plant #1 is published. One employer, no account, unsubscribe in one click.
Site address
209 GLEN BASS RD
City
FITZGERALD
State
GA
ZIP
31750
Mailing
P.O. BOX 250, FITZGERALD, GA 31750
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
2451
Employees
202
Ownership type
A
Industry flags
Manufacturing health.

No citations on file for this inspection. OSHA's citation feed is backfilled in rolling windows; this inspection may have been closed without violations, or its citation rows may not have been ingested yet.

View PIONEER HOUSING SYSTEM, INC. - PLANT #1's full OSHA safety record →

KGC, INC.

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 106451669.