OSHA Inspection: CHRIS PARLY DBA PARLY CONSTRUCTION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of CHRIS PARLY DBA PARLY CONSTRUCTION in LOT 8/DAVIS CT NE, TACOMA, WA 98422 (NAICS 000000). OSHA activity number 115176117.

Watch Chris Parly DBA Parly Construction — free Get an email when a new federal OSHA severe-injury report for Chris Parly DBA Parly Construction is published. One employer, no account, unsubscribe in one click.
Site address
LOT 8/DAVIS CT NE
City
TACOMA
State
WA
ZIP
98422
Mailing
PO BOX 23755, FEDERAL WAY, WA 98093
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
1521
Employees
3
Ownership type
A

3 citations on file for this inspection.

15524510

Repeat 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $640.00 · Current $640.00
Recent events (2)
  • — Y (R) $640.00
  • — Z (R) $640.00

1552450501

Repeat 1 instance 1 exposed
Issued
Abate by
Recent events (2)
  • — Y (R)
  • — Z (R)

1550020006

Other-than-serious 2 instances 2 exposed
Issued
Abate by
Recent events (2)
  • — Y (O)
  • — Z (O)

View CHRIS PARLY DBA PARLY CONSTRUCTION's full OSHA safety record →