FORT SMITH, AR —
OSHA Inspection: PLASTICS RESEARCH AND DEVELOPMENT CORPORATION
Complaint inspection · Health discipline
At a glance
On , OSHA opened a complaint health inspection of PLASTICS RESEARCH AND DEVELOPMENT CORPORATION in 3601 JENNY LIND RD., FORT SMITH, AR 72901 (NAICS 000000). OSHA activity number 116480906.
Where did this inspection happen?
- Establishment
- PLASTICS RESEARCH AND DEVELOPMENT CORPORATION
- Site address
- 3601 JENNY LIND RD.
- City
- FORT SMITH
- State
- AR
- ZIP
- 72901
- Mailing
- P.O. BOX 1587, FORT SMITH, AR 72901
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3949
- Employees
- 299
- Ownership type
- A
Citations
9 citations on file for this inspection.
5(a)(1)
- Issued
- Abate by
- Penalty
- Initial $6300.00 · Current $6300.00
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were required to perform tasks involving ergonomic risk factors (including but not limited to repetitive motions, force, and postures) resulting in stressors that had caused, were causing or likely to cause cumulative trauma disorders(s): At the Facility, employees in the Metalizing Department doing tasks such as racking lures, unracking lures and vacuuming and employees in the molding department doing tasks such as clipping, assembly, trimming, sanding and staking were exposed to identified ergonomic risk factors, which have caused or are likely to cause cumulative trauma disorders of the upper extremities, including carpal tunnel syndrome, cysts and tendinitis of the wrist, arms and shoulders. The employer did not implement an effective control strategy to reduce or eliminate such disorders. The injury and illness records for 1994 to the present documented a pattern of cumulative trauma disorders. Among other methods, one feasible and acceptable abatement method to correct this hazard is the implementation of an ergonomics management program consisting of the following four elements: (1)Worksite analysis to recognize and identify existing ergonomic risk factors in the workplace. This analysis should include development and use of an ergonomic checklist and employee questionnaire. Periodic surveys of the workplace shall be conducted at appropriate intervals to evaluate work practices and engineering controls. Employee participation in the ergonomic program should be encouraged through a mechanism such as a safety committee. Disclaimer:Any committees formed shall be in accordance with applicable labor relations laws. (2)Medical management which includes accurate recordkeeping of cumulative trauma disorders. The program should address early recognition, evaluation, and referral of cumulative trauma disorder cases, and should include conservative treatment and conservative return to work. Systemic worksite review by the medical team should also be included in the program. (3)Training and education for exposed employees, including methods to evaluate the effectiveness of the training. Re-training should be done annually, or as operations change. Training should address hazards associated with the job, the risks of developing cumulative trauma disorders, symptoms of exposure, and how to prevent the occurrence of cumulative trauma disorders. A supervisor's training program should also be implemented to allow recognition of the signs of cumulative trauma disorders and to reinforce the employer's ergonomics program. The training program should include the establishment's health care providers to ensure that they are able to recognize and prescribe appropriate treatment for cumulative trauma disorders.(4)Hazard prevention and control which includes engineering, work practice, and administrative controls, and personal protective equipment where relevant. (a)Engineering controls are designed by a qualified ergonomist and may include workstation redesign, tool and handle redesign, and change in work methods. The goal of this program should be to make the job fit the person. Examples of engineering controls applicable to this workplace include: Metalizing Department (i)Provide a jig to hold the bars that the employees hold while vacuuming the lures to reduce static loading of the shoulders, gripping of the bar and wrist deviations. (ii)Add a handle to the vacuum hose (instead of the pipe elbow) for the employees to use to hold the vacuum. (iii)Add a counterbalance to hold the vacuum to reduce the weight that the employee has to hold in an elevated position. (iv)Provide footrests for the employees sitting by the line and at tables. Molding Department (i)Relocate the table/workstation legs so that employees will have more room to position their chairs and allow them to sit in a neutral position. (ii)Evaluate the use of air snips to clip the flash off of the parts. (iii)Provide clippers with various types of handles to fit each employee (ie. length of the handles and width of the handles). (iv)Evaluate different types of knives to do the trimming (size of handle, length of blade, disposable vs. non disposable). (v)Redesign the workstation for the sanding operation so that the employees can push their chair under the work station and do not have to straddle the sanding belt. (vi)Design a tool to dispense the various parts. An example for the weights would be a cylindrical tube similar to a ball point pin that the employee could press a release to dispense the weights thus eliminating the pinch grip. (vii)Redesign the Heddon Line so that the employees do not have to reach behind them to open the door to the injection molding machine and twist and reach to do the various jobs on the line. (viii)Move the conveyor or add a slide that drops in a box next to the employees so that the parts will fall closer to the employees to reduce the reach distance. (ix)Redesign the staking paddles job so that the parts are brought to the employee instead of the employee reaching under the injection molding machine for parts. (xi)Redesign the staking paddles job so that the employee does not have to reach above shoulder height to operate the staker. (b)Administrative controls are implemented which reduce the duration, frequency, and severity of exposure to ergonomic stress. There controls may include job rotation, reduction of repetitions, and preventative maintenance of related equipment. Personal protective equipment shall be evaluated to determine any contribution of ergonomic stress. Examples of administrative controls applicable to this workplace include: Metalizing Department (i)Ensure that the job rotation program in the metalizing department does not rotate employees to jobs where they would use the same muscle/tendon groups. Molding Department (i)Evaluate the "goals" or number of parts per hour for each machine. (c)Work Practice controls are implemented which include proper work techniques, new employee conditioning , and monitoring and modifications as necessary to minimize ergonomic stressors. Examples of work practice controls applicable to this workplace include: Metalizing Department (i)Ensure that the employees have their chairs adjusted to a work height so that the body remains in a neutral posture. (ii)Provide a conditioning period or "ramp in" period for new employees. Molding Department (i)Ensure that the employee have their chair adjusted to a work height so that the body remains in a neutral posture. (ii)Provide a conditioning period or "ramp in" period for new employees and employees that change to different jobs. Step 1Implementation of an ergonomics program for worksite analysis, medical management, and training and education, as detailed in items 1-2 above. Step 2Submit to the Area Director a written, detailed plan of abatement outlining a schedule for the implementation of the engineering, administrative, and work practice controls as detailed in items 4(a)-4(c) . ALL PROPOSED CONTROL MEASURES SHALL BE APPROVED FOR EACH PARTICULAR USE BY A PERSON TRAINED IN THE EVALUATION OF WORKPLACE CONDITIONS WHICH CAUSE CUMULATIVE TRAUMA DISORDERS. SIXTY (60) DAY PROGRESS REPORTS ARE REQUIRED DURING THE ABATEMENT PERIOD Step 3Implementation of engineering, administrative, and work practice controls, as described in items 4(a)-4(c). Disclaimers: 1.The employer is not limited to the abatement methods suggested by OSHA. 2.The methods explained are general and may not be effective in all cases. 3.The employer is responsible for selecting and carrying out an appropriate abatement method.
Recent events (2)
- — F (S) $6300.00
- — Z (S) $6300.00
1910.22 A02
- Issued
- Abate by
- Penalty
- Initial $1350.00 · Current $900.00 Reduced
Recent events (2)
- — F (S) $900.00
- — Z (S) $1350.00
1910.132 A
- Issued
- Abate by
- Penalty
- Initial $3150.00 · Current $900.00 Reduced
Recent events (2)
- — F (S) $900.00
- — Z (S) $3150.00
1910.151 C
- Issued
- Abate by
- Penalty
- Initial $1800.00 · Current $900.00 Reduced
Recent events (2)
- — F (S) $900.00
- — Z (S) $1800.00
1910.1200 F05 I
- Issued
- Abate by
- Penalty
- Initial $1350.00 · Current $900.00 Reduced
Recent events (2)
- — F (S) $900.00
- — Z (S) $1350.00
1910.1200 F05 II
- Issued
- Abate by
Recent events (2)
- — F (S)
- — Z (S)
1904.2 A
- Issued
- Abate by
- Penalty
- Initial $1000.00 · Current $900.00 Reduced
Recent events (2)
- — F (O) $900.00
- — Z (O) $1000.00
1910.133 A01
- Issued
- Abate by
Recent events (2)
- — F (O)
- — Z (O)
1910.134 B10
- Issued
- Abate by
Recent events (2)
- — F (O)
- — Z (O)
More inspections at PLASTICS RESEARCH AND DEVELOPMENT CORPORATION
FORT SMITH, AR—1997-01-21 00:00:00
PLASTICS RESEARCH AND DEVELOPMENT CORPORATION
View PLASTICS RESEARCH AND DEVELOPMENT CORPORATION's full OSHA safety record →
More inspections in this industry (NAICS 000000)
SCHENECTADY, NY—2012-01-05 00:00:00
BRUCE D. BOWMAN
BILLINGS, MT—2005-01-25 00:00:00
KGC, INC.
ROCKAWAY, NJ—2002-12-31 00:00:00
ROCKAWAY BOROUGH DPW
FOREST CITY, NC—2002-12-31 00:00:00
HARRY BRICKEY DBA A. BRICKEY CEILING COMPANY
EDGERTON, KS—2002-12-31 00:00:00
SUDDEN BOND INDUSTRIES
More inspections in AR
SILOAM SPRINGS, AR—2026-07-15 00:00:00
CR CRAWFORD CONSTRUCTION LLC
VAN BUREN, AR—2026-07-14 00:00:00
MILLAR PARTNERS, LLC
BRINKLEY, AR—2026-07-14 00:00:00
ROGER WILKISON FARMS PARTNERSHIP
SEARCY, AR—2026-07-14 00:00:00
MASTER?S PLASTERING & MORE INC
LITTLE ROCK, AR—2026-07-09 00:00:00
NABHOLZ CONSTRUCTION CORPORATION
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 116480906.