WATERFORD, MI —
OSHA Inspection: BIG KMART #3379
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of BIG KMART #3379 in 5100 DIXIE HWY, WATERFORD, MI 48329 (NAICS 000000). OSHA activity number 125013334.
Where did this inspection happen?
- Establishment
- BIG KMART #3379
- Site address
- 5100 DIXIE HWY
- City
- WATERFORD
- State
- MI
- ZIP
- 48329
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 5331
- Employees
- 200
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
18 citations on file for this inspection.
4081003408
- Issued
- Abate by
- Penalty
- Initial $825.00 · Current $412.00 Reduced
Recent events (2)
- — I (S) $412.00
- — Z (S) $825.00
4081021302
- Issued
- Abate by
- Penalty
- Initial $825.00 · Current $413.00 Reduced
Recent events (2)
- — I (S) $412.50
- — Z (S) $825.00
4081022701
- Issued
- Abate by
- Penalty
- Initial $825.00 · Current $413.00 Reduced
Recent events (2)
- — I (S) $412.50
- — Z (S) $825.00
4081043305
- Issued
- Abate by
- Penalty
- Initial $825.00 · Current $413.00 Reduced
Recent events (2)
- — I (S) $412.50
- — Z (S) $825.00
4081045403
- Issued
- Abate by
- Penalty
- Initial $825.00 · Current $413.00 Reduced
Recent events (2)
- — I (S) $412.50
- — Z (S) $825.00
4081064502
- Issued
- Abate by
- Penalty
- Initial $825.00 · Current $413.00 Reduced
Recent events (2)
- — I (S) $412.50
- — Z (S) $825.00
4081063201
- Issued
- Abate by
- Penalty
- Initial $825.00 · Current $413.00 Reduced
Recent events (2)
- — I (S) $412.50
- — Z (S) $825.00
4081144202
- Issued
- Abate by
- Penalty
- Initial $825.00 · Current $413.00 Reduced
Recent events (2)
- — I (S) $412.50
- — Z (S) $825.00
4081216101 A
- Issued
- Abate by
- Penalty
- Initial $1925.00 · Current $963.00 Reduced
Recent events (2)
- — I (S) $962.50
- — Z (S) $1925.00
4081330801
- Issued
- Abate by
- Penalty
- Initial $825.00 · Current $413.00 Reduced
Recent events (2)
- — I (S) $412.50
- — Z (S) $825.00
1910.303 G02 I
- Issued
- Abate by
- Penalty
- Initial $825.00 · Current $413.00 Reduced
Recent events (2)
- — I (S) $412.50
- — Z (S) $825.00
4081001501
- Issued
- Abate by
4081001504
- Issued
- Abate by
4081022101
- Issued
- Abate by
4081063101
- Issued
- Abate by
4081068503
- Issued
- Abate by
4081216303
- Issued
- Abate by
1910.305 G01
- Issued
- Abate by
More inspections at BIG KMART #3379
WATERFORD, MI—1998-10-01 00:00:00
BIG KMART #3379
WATERFORD, MI—1998-10-01 00:00:00
BIG KMART #3379
View BIG KMART #3379's full OSHA safety record →
More inspections in this industry (NAICS 000000)
SCHENECTADY, NY—2012-01-05 00:00:00
BRUCE D. BOWMAN
BILLINGS, MT—2005-01-25 00:00:00
KGC, INC.
ROCKAWAY, NJ—2002-12-31 00:00:00
ROCKAWAY BOROUGH DPW
FOREST CITY, NC—2002-12-31 00:00:00
HARRY BRICKEY DBA A. BRICKEY CEILING COMPANY
EDGERTON, KS—2002-12-31 00:00:00
SUDDEN BOND INDUSTRIES
More inspections in MI
SALINE, MI—2026-07-17 00:00:00
LIEBHERR AEROSPACE SALINE INC
MONTROSE, MI—2026-07-17 00:00:00
MONTROSE COMMUNITY SCHOOL
FLINT, MI—2026-07-17 00:00:00
CSL PLASMA
LIVONIA, MI—2026-07-17 00:00:00
IMPELLAM GROUP DBA FORD RACING
FLINT, MI—2026-07-17 00:00:00
WILDFIRE INVESTMENT LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 125013334.