GANADO, AZ —
OSHA Inspection: BLAZE CONSTRUCTION
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of BLAZE CONSTRUCTION in HWY 264 & BIA RT. 15, GANADO, AZ 86505 (NAICS 000000). OSHA activity number 18090811.
Where did this inspection happen?
- Establishment
- BLAZE CONSTRUCTION
- Site address
- HWY 264 & BIA RT. 15
- City
- GANADO
- State
- AZ
- ZIP
- 86505
- Mailing
- 1000 GAVELDON RD., NW, ALBUQUERQUE, NM 87104
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 1521
- Employees
- 30
- Ownership type
- A
- Industry flags
- Construction safety.
Citations
16 citations on file for this inspection.
1926.59 E01
- Issued
- Abate by
- Penalty
- Initial $450.00 · Current $250.00 Reduced
Recent events (2)
- — I (S) $250.00
- — Z (S) $450.00
1926.59 G01
- Issued
- Abate by
1926.59 H
- Issued
- Abate by
1926.100 A
- Issued
- Abate by
- Penalty
- Initial $540.00 · Current $350.00 Reduced
Recent events (2)
- — I (S) $350.00
- — Z (S) $540.00
1926.150 A04
- Issued
- Abate by
- Penalty
- Initial $360.00 · Current $200.00 Reduced
Recent events (2)
- — I (S) $200.00
- — Z (S) $360.00
1926.152 D04
- Issued
- Abate by
1926.152 G11
- Issued
- Abate by
1926.404 F07 IVC
- Issued
- Abate by
- Penalty
- Initial $630.00 · Current $425.00 Reduced
Recent events (2)
- — I (S) $425.00
- — Z (S) $630.00
1926.450 A01
- Issued
- Abate by
- Penalty
- Initial $360.00 · Current $200.00 Reduced
Recent events (2)
- — I (S) $200.00
- — Z (S) $360.00
1926.450 A02
- Issued
- Abate by
- Penalty
- Initial $450.00 · Current $250.00 Reduced
Recent events (2)
- — I (S) $250.00
- — Z (S) $450.00
1926.450 B12
- Issued
- Abate by
1926.450 A09
- Issued
- Abate by
- Penalty
- Initial $540.00 · Current $350.00 Reduced
Recent events (2)
- — I (S) $350.00
- — Z (S) $540.00
1926.450 A10
- Issued
- Abate by
- Penalty
- Initial $540.00 · Current $350.00 Reduced
Recent events (2)
- — I (S) $350.00
- — Z (S) $540.00
1926.500 B01
- Issued
- Abate by
- Penalty
- Initial $360.00 · Current $170.00 Reduced
Recent events (2)
- — I (S) $170.00
- — Z (S) $360.00
1926.500 B05
- Issued
- Abate by
- Penalty
- Initial $270.00 · Current $160.00 Reduced
Recent events (2)
- — I (S) $160.00
- — Z (S) $270.00
1926.602 A09 II
- Issued
- Abate by
- Penalty
- Initial $630.00 · Current $425.00 Reduced
Recent events (2)
- — I (S) $425.00
- — Z (S) $630.00
More inspections at BLAZE CONSTRUCTION
SAINT CLAIRSVILLE, OH—2014-05-23 00:00:00
BLAZE CONSTRUCTION
INDEPENDENCE, OH—2010-04-16 00:00:00
BLAZE CONSTRUCTION
INDIANAPOLIS, IN—2006-08-04 00:00:00
BLAZE CONSTRUCTION
RENO, NV—1990-10-26 00:00:00
BLAZE CONSTRUCTION
SELLS, AZ—1989-08-14 00:00:00
BLAZE CONSTRUCTION
View BLAZE CONSTRUCTION's full OSHA safety record →
More inspections in this industry (NAICS 000000)
SCHENECTADY, NY—2012-01-05 00:00:00
BRUCE D. BOWMAN
BILLINGS, MT—2005-01-25 00:00:00
KGC, INC.
ROCKAWAY, NJ—2002-12-31 00:00:00
ROCKAWAY BOROUGH DPW
FOREST CITY, NC—2002-12-31 00:00:00
HARRY BRICKEY DBA A. BRICKEY CEILING COMPANY
EDGERTON, KS—2002-12-31 00:00:00
SUDDEN BOND INDUSTRIES
More inspections in AZ
CHANDLER, AZ—2026-07-16
SUN STATE BUILDERS
CHANDLER, AZ—2026-07-16
PREMIER UNDERGROUND CONSTRUCTION LLC
CAMP VERDE, AZ—2026-07-14
CLIFF CASTLE CASINO & HOTEL
CAMP VERDE, AZ—2026-07-14
CLIFF CASTLE CASINO & HOTEL
TUCSON, AZ—2026-07-10
CPX2026XJL680X0074 - JANC EXCAVATING AND CONSTRUCTION, LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 18090811.