BRUSH, CO —
OSHA Inspection: PINNEO FEEDLOT, LTD. LIABILITY COMPANY
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of PINNEO FEEDLOT, LTD. LIABILITY COMPANY in 32295 HIGHWAY 34, BRUSH, CO 80723 (NAICS 112112). OSHA activity number 309006898.
Where did this inspection happen?
- Establishment
- PINNEO FEEDLOT, LTD. LIABILITY COMPANY
- Site address
- 32295 HIGHWAY 34
- City
- BRUSH
- State
- CO
- ZIP
- 80723
- Mailing
- P.O. BOX 384, BRUSH, CO 80723
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 112112
- SIC code (legacy)
- 0211
- Employees
- 54
- Ownership type
- A
Citations
16 citations on file for this inspection.
5(a)(1)
- Issued
- Abate by
- Penalty
- Initial $2500.00 · Current $1750.00 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to fall hazards: (a)Pinneo Feedlot, Ltd. Liability Company at 32295 Highway 34, Brush, CO 80723: On or before 09/19/06, the employer did not ensure that open floors or platforms that were 4 feet or more above ground level were guarded by standard railings or the equivalent in the following instances: 1)The four corn silos in Brush included a 6 foot long walkway between each silo (three walkways) which included top rails at 36 inches high, but no midrails. Employees accessed each walkway to inventory the corn twice per month. Condition exposed employees to fall hazards of up to 40 feet; 2)The Butler corn bin in Brush did not provide standard railings where the employees inventory the corn by dropping a tape measure into the bin twice per month. The rail system stops several feet from both of the upper and lower holes. Conditions exposed employees to fall hazards of up to 40 feet; 3) The scalper catwalk in Brush included a stairrail system on the outside, and the conveyor provided guarding for the top rail on the inside. However, the distance from the catwalk to the conveyor measured 31 inches, and was missing a midrail on both the east and west sides of the scalper. Condition exposed employees to fall hazards of up to 40 feet; 4)A gap of 13" existed between the fixed ladder and the guardrail at the second silo. Condition exposed employees to fall hazards of up to 40 feet; 5)The room above the tool room included two 10' sides that had no guardrails, with a fall hazard of 8' 11"; 6)The platform above the flakers in the mill room was missing guardrails around its perimeter, with gaps measuring 8" to 12" between the platform and the wall, with fall hazards of up to 20'; 7)The platform one level down, accessed by ladder on the way to the bottom of the elevator leg, was missing guardrails, with openings estimated of 18" around the perimeter of the platform, with fall hazards of about 10'; 8)The platform used to access the open belts and pulleys on the north side of the mill, about midway up about at 40' high, did not extend all of the way to the motor, exposing employees to fall hazards when servicing this motor; 9)The door used to access the platform on the north side of the mill, about 40' high, swings into the platform inside the mill, where employees could beclimbing up the ladder and accessing this platform at the same time the door opens. If the door were to strike an employee, it would cause them to fall 13' through the open ladderway, onto the platform below. The door was not hinged on the correct side, and there was no way to keep the door open, and there was no means of communicating to employees climbing up that the door could open and strike them. Condition exposed employees to falls of 13'; 10)The platform used to access the liquid feeders, where the trucks pull in to obtain liquid supplement, was missing its midrail on all sides. Condition exposed employees to fall hazards of 13'; Abatement Note: Abatement certification and documentation are required for this item (see enclosed "Sample Abatement-Certification Letter") Abatement Note: Among other methods, one feasible and acceptable abatement method is to construct a standard railing consisting of a top rail 42 inches high, and a midrail 21 inches high, with the system capable of withstanding 200 pounds of top rail pressure, as referenced in 1910.23(e) and associated ANSI standards.
Recent events (2)
- — I (S) $1750.00
- — Z (S) $2500.00
5(a)(1)
- Issued
- Abate by
- Penalty
- Initial $1250.00 · Current $875.00 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to fall hazards: (a)Pinneo Feedlot, Ltd. Liability Company at 32295 Highway 34, Brush, CO 80723: On or before 09/19/06, the employer did not ensure that open floor holes were covered in the following instances: 1)Employees climbed to the top of the four corn silos in Brush twice per month to inventory the corn. Each silo included two circular openings measuring 19 inches in diameter. Employees opened the lid for each opening, and dropped a tape measure to measure the corn. One hole in each silo included some metal framework with gaps uo to 10", and the other hole in each silo had no metal framework to prevent falling through the 19" circular hole. Condition exposed employees to fall hazards of up to 40 feet; 2)Employees climbed to the top of the three liquid silos in Brush twice per month to inventory the liquid additives. Each silo included two circular openings measuring 19 inches in diameter. Employees opened the lid for each opening, and dropped a tape measure to measure the liquid. One hole in each silo included some metal framework with gaps up to 10", and the other hole in each silo had no metal framework to prevent falling through the 19" circular hole. Condition exposed employees to fall hazards of up to 25 feet; 3)Employees climbed to the top of the three corn silos in Akron twice per month to inventory the corn. The two older silos included two circular openings measuring 19 inches in diameter. Employees opened the lid for each opening, and dropped a tape measure to measure the corn. The newer silo included one hole mesuring 19 inches in diameter; the other hole was smaller and guarded to prevent employees from falling through it. Conditions exposed employees to fall hazards of up to 24 feet; Conditions exposed employees to fall hazards. Abatement Note: Abatement certification is required for this item (see enclosed "Sample Abatement-Certification Letter") Among other methods, one feasible and acceptable abatement method is to cover the floor hole with a metal grill that is strong enough to support the weight of any employees who might step on it, but still provide space for the employees to drop tape measures through it. The metal grill can be set lower than the covers, to allow the covers to still be closed to keep out the weather when the holes are not in use. Reference 1910.23 and associatd ANSI standards.
Recent events (2)
- — I (S) $875.00
- — Z (S) $1250.00
5(a)(1)
- Issued
- Abate by
- Penalty
- Initial $2500.00 · Current $1750.00 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to fall hazards: (a)Pinneo Feedlot, Ltd. Liability Company at 32295 Highway 34, Brush, CO 80723: On or before 09/19/06, the employer did not ensure that employees climbing fixed ladders, and standing on the top platforms, were protected in the following conditions: 1) The fixed ladders used to access the two older corn bins at the Akron site had no cages at both the vertical sections to get to the ridge, and on the roofs; 2)The fixed ladders for the newer bin at the Akron site, and for the corn bin at the Brush site, had no cages on the sections of ladder on the roofs; 3)The fixed ladders for the two older bins at the Akron site, and also the fixed ladder for the corn bin at the Brush site, had no platforms for the employees to stand on when taking measurements of corn depths; 4)The molasses silo at the Brush site had a cage up part way, but was missing a cage at the 21' mark to he 28' mark; 5)The employees did not wear ladder assist devices when climbing fixed ladders on the corn silos, corn bins, and liquid storage silos, with ladders as high as 40'; 6)Employees climbed to the very top of the Brush site on a ladder that had no cage (see note #2 below); 7)Employees climbed to the very top of the Brush site using harnesses with ropes, but did not use shock absorbing lanyards; 8)Employees climbed to the very top of the Brush site without using 100 fall protection (see note #3 below); 9)The employer did not ensure that employees climbing a fixed ladder had a clear and open landing, in that an air vent blocked this passage. The air vent measured 18" high and 10" wide in blocking egress to the fixed ladder. (See note #4 below); 10)The ladder on the Roto-Mix truck # 620-16 in Akron was bent with a broken rung; 11)The fixed ladders attached to the older bins at the Akron site were made of angle iron, and included sharp edges; 12)The ladder to the room above the tool room was extended up only 11", and was not secured. Conditions exposed employees to fall hazards of up to 70 feet; Abatement Note #1 Abatement certification and documentation are required for this item (see enclosed "Sample Abatement-Certification Letter") Abatement Note #2: For the ladder used to access the top of the Brush site, a ladder assist device could be used in lieu of a cage. The ladder assist device would need to stop a person fall within several inches after a mis-step. Abatement Note #3: When climbing to the top of the Brush site, it is recommended that a retractable lanyard be anchored at the top with sufficient support for a fall, such as a 5,000 pound anchorage point. Once set in place, it is recommended that you tie a rope to the hook, and the rope should be long enough to reach from the hook to the platform at the base of the ladder, when the retractable lanyard is fully retracted. Tie the rope to the lower rung, as a means of securing the rope until needed. When climbing, pull the retractable hook down via the rope, disconnect the rope and connect the hook to the back of the harness, and use this for fall protection. The retractable lanyard should be used in addition to a ladder climbing device, hooked to the front of the harness. Abatement Note #4: Among other methods, several feasible and acceptable abatement methods exist, including: 1) Do not use this ladder, and block off access with a hinged door at the bottom of the cage, preventing personnel from climbing the ladder, but allowing personnel to exit this ladder in case of an emergency. Since this ladder serves the last two silos, it is important to maintain egress, but not access; 2) Move the ladder; or 3) move the vent. Abatement Note #5: Among other methods, one feasible and acceptable abatement method is to follow the fixed ladders conform to standards set out in 1910.27 and associated ANSI standards, and that personal fall arrest systems meet the standards set out in 1910.66(j) and associated ANSI standards such as Z359.1.
Recent events (3)
- — P (S) $1750.00
- — I (S) $1750.00
- — Z (S) $2500.00
5(a)(1)
- Issued
- Abate by
- Penalty
- Initial $750.00 · Current $375.00 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to fall hazards: (a)Pinneo Feedlot, Ltd. Liability Company at 32295 Highway 34, Brush, CO 80723: On or before 09/19/06, the employer did not ensure that a stairwell used to access the tool room had handrails. The stairwell measured 41" wide and 52" high with 6 steps, and was open on one side, with no handrails on either side. Condition exposed employees to fall hazards of up to 52". Abatement Note: Abatement certification is required for this item (see enclosed "Sample Abatement-Certification Letter") Abatement Note: Among other methods, one feasible and acceptable abatement method is to install a standard handrail on the open side of the stairs. The criteria for a standard railing is also referenced in 1910.23(d), and 1910.24(h).
Recent events (2)
- — I (O) $375.00
- — Z (S) $750.00
5(a)(1)
- Issued
- Abate by
- Penalty
- Initial $1250.00 · Current $875.00 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to shock hazards: (a)Pinneo Feedlot, Ltd. Liability Company at 32295 Highway 34, Brush, CO 80723: On or before 09/19/06, the employer did not ensure that employees were not exposed to shock hazards in the following instances: 1)The wiring to the fluorescent light in the tool room was hanging down to 80" above the floor, and was missing its outer insulation; 2)The dual 8' long fluorescent light in the tool room was missing one bulb, and the ballast was broken with exposed live parts. The light was 87" high, and had no guard to protect the lights. In addition, this light fixture was not grounded; 3)The wiring to the fluorescent light in the room above the tool room was hanging down to 76" above the floor, and was missing its outer insulation; 4)The dual 6' long fluorescent light in the tool room was 79" high, and had no guard to protect the lights; 5)The dual 6' long fluorescent light in the maintenance shop were 72" high, and had no guard to protect the lights. Conditions exposed employees to shock hazards of 120 volts. Abatement Note: Abatement certification is required for this item (see enclosed "Sample Abatement-Certification Letter") Abatement Note: Among other methods, one feasible and acceptable abatement method is to run approved permanent insulated wiring to the fixtures (reference 1910.305(i), and lighting fixtures, lamps, and receptacles less than 8' high shall have no exposed parts and require protection for the lights (reference 1910.305(j); the conductors shall be insulated (reference 1910.305(f); the fixtures shall be grounded (reference 1910.304(f); and associated ANSI standards.
Recent events (2)
- — I (O) $875.00
- — Z (S) $1250.00
5(a)(1)
- Issued
- Abate by
- Penalty
- Initial $750.00 · Current $525.00 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to fire hazards: (a)Pinneo Feedlot, Ltd. Liability Company at 32295 Highway 34, Brush, CO 80723: On or before 09/19/06, the employer did not ensure that exit routes in the Brush mill were properly identified and operational: 1)The back door was missing an exit sign; 2)The back door had a bolt and latch type handle, and the employees would have difficulty opening this type of handle in a hurry in the dark; and 3)The exit doors did not have illuminated exit signs. Conditions exposed employees to fire and burn hazards. Abatement Note: Abatement certification is required for this item (see enclosed "Sample Abatement-Certification Letter") Abatement Note: Among other methods, one feasible and acceptable abatement method is to install exit signs illuminated to a surface value of at least 5 foot candles (54 lux) by a reliable light source and be distinctive in color. Self-luminous or electroluminescent signs that have a minimum luminance surface value of at least .06 foot-lamberts ((0.21 cd/m2) are permitted. Reference 1910.37(b)(6) and associated ANSI standards.
Recent events (2)
- — I (O) $525.00
- — Z (S) $750.00
5(a)(1)
- Issued
- Abate by
- Penalty
- Initial $1000.00 · Current $700.00 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to corrosive chemicals: (a)Pinneo Feedlot, Ltd. Liability Company at 32295 Highway 34, Brush, CO 80723: On or before 09/19/06, the employer did not ensure that an eyewash station was located where employees handle corrosive chemicals such as caustic soda. Some of the corrosive chemicals have a pH of 13.5 which can cause serve tissue damage upon contact with the skin and eyes. Abatement Note: Abatement certification is required for this item (see enclosed "Sample Abatement-Certification Letter")
Recent events (2)
- — I (S) $700.00
- — Z (S) $1000.00
5(a)(1)
- Issued
- Abate by
- Penalty
- Initial $1250.00 · Current $875.00 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to burn hazards: (a)Pinneo Feedlot, Ltd. Liability Company at 32295 Highway 34, Brush, CO 80723: On or before 09/19/06, the employer did not ensure that employees were protected from hot steam in the process of blowing down the boiler. The steam was exhausted into a drain, but blew out of the drain, into areas where employees could walk to pick up tools, hoses, and other equipment. The area was not barricaded off, and procedures were not set in place, to warn employees to avoid this area when blowing down the boiler. Condition exposed employees to burn hazards. Abatement Note: Abatement certification is required for this item (see enclosed "Sample Abatement-Certification Letter") Abatement Note: Among other methods, one feasible and acceptable abatement method is to establish a procedure requiring advance communication and warning among employees, and barricading off the area where steam exhausts out. This procedure should be stated as an extension of a lockout tagout policy.
Recent events (2)
- — I (S) $875.00
- — Z (S) $1250.00
5(a)(1)
- Issued
- Abate by
- Penalty
- Initial $750.00 · Current $525.00 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to embolism hazards: (a)Pinneo Feedlot, Ltd. Liability Company at 32295 Highway 34, Brush, CO 80723: On or before 09/19/06, the employer did not ensure that compressed air used for cleaning purposes was reduced down to less than 30 p.s.i. when dead-ended. The employees used the compressed air to clean the loaders by the hay grinder, and to clean trucks. Condition exposed employees to embolism hazards. Abatement Note: Abatement certification is required for this item (see enclosed "Sample Abatement-Certification Letter") Abatement Note: Among other methods, one feasible and acceptable abatement method is to use approved nozzles with safety outlets that reduce the p.s.i. to less than 30 p.s.i. when deadended. Reference 1910.242 and associated ANSI standards.
Recent events (2)
- — I (O) $525.00
- — Z (S) $750.00
5(a)(1)
- Issued
- Abate by
- Penalty
- Initial $1250.00 · Current $875.00 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to chemical and laceration hazards: (a)Pinneo Feedlot, Ltd. Liability Company at 32295 Highway 34, Brush, CO 80723: On or before 09/19/06, the employer did not conduct a hazard assessment of the workplace, including both the maintenance shop and the mill, to determine if hazards are present, or ar likely to be present, which necessitates the use of personal protective equipment. Where personal protective equipment was necessitated, the employer did not; 1)Select, and have each affected employee use, the types of PPE that will protect the employee from the hazards identified in the hazard assessment; 2)Communicate selection decisions to each affected employee; 3)Select PPE that properly fits each affected employee. Employees were exposed to chemical hazards when working with solvents, antifreeze, oil, and other chemicals without the use of splash resistant glasses, and without the use of chemical resistant gloves. Employees working with sharp objects, and also exposed to grain dust in and around the mill. This is applicable to both sites. Abatement Note: Abatement certification is required for this item (see enclosed "Sample Abatement-Certification Letter") Abatement Note: Among other methods, one feasible and acceptable abatement method is to follow manufacturers directions and material safety data sheets in providing and requiring the use of appropriate personal protective equipment. Also point of reference is 1910.132(d). A hazard assessment consists of identifying the tasks, the hazards associated with the tasks, and finally, the necessary personal protective equipment. This hazard assessment should be posted on the employee bulletin board to serve as a means of communicating expectations related to required PPE.
Recent events (2)
- — I (O) $875.00
- — Z (S) $1250.00
5(a)(1)
- Issued
- Abate by
- Penalty
- Initial $1250.00 · Current $875.00 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to fire and explosion hazards: (a)Pinneo Feedlot, Ltd. Liability Company at 32295 Highway 34, Brush, CO 80723: On or before 09/19/06, the employer did not ensure that employees were protected from compressed gases in the following conditions: 1)The employer did not secure compressed gas cylinders stored in the maintenance shop; and 2) The employer did not separate acetylene and oxygen cylinders by a minimum distance of 20 feet, or by establishing a 5 foot high noncombustible partition, having a fire resistant rating of at least 1/2 hour. Condition exposed employees to fire and explosion hazards. Abatement Note: Abatement certification is required for this item (see enclosed "Sample Abatement-Certification Letter") Abatement Note: Among other methods, one feasible and acceptable abatement method is to follow the directions provided in the Compressed Gas Association Pamphlet # G-1 and P-1, as stated above.
Recent events (2)
- — I (S) $875.00
- — Z (S) $1250.00
5(a)(1)
- Issued
- Abate by
- Penalty
- Initial $2500.00 · Current $1750.00 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to confined space hazards: (a)Pinneo Feedlot, Ltd. Liability Company at 32295 Highway 34, Brush, CO 80723: On or before 09/19/06, the employer did not ensure that employees entering the Butler corn bin and the three other white corn bins, as well as the corn bins at the Akron site, were protected by an established permit required confined space (PRCS) program. The employees entered the bins to clean them out one to two times per year. The employees accessed each bin by climbing a fixed ladder outside each bin, to an elevated hatch, and then entering the bin and descending to the corn. The base of each bin was concave with about an 8 foot drop towards the center of each bin. The employer added water to the corn when it is stored in the bin, but, according to the employer, the employer did not experience corn bridging. The employer had not established a permit required confined space (PRCS) program. The employer said he locked out the controls for the bottom (exhaust) auger prior to entry, but not the upper (feed) auger. The employer said that two employees entered the bins, while one employee was stationed outside the bin. However, the employee stationed outside the bin would periodically leave to check the controls. The current procedures include the following deficiencies: 1)There were no signs posted advising of PRCS; 2) There was no accountability for assessment of the conditions prior to entry; 3)There was no assessment of the atmosphere as to whether any oxygen deficiencies or flammable dust existed; 4)There was no assessment of potential bridging conditions of the corn; 5)There were no lockout/tagout procedures in place for the upper (feed) auger; 6)There was no training for employees on safe PRCS procedures. 7)There was no permit system establishing accountability for PRCS authorization and closure, records of employees authorized entrance, and records of employees serving as attendants. 8)There was no use of a body harness with a lifeline positioned, and of a certain length, to prevent employees from sinking further than waist deep into the corn. 9)There were no adequate retrieval devices to pull employees out of the bin if a collapse were to occur, including a pulley connected to the top of the hatch, and a powered device to pull employees up; 10)There were no alarms or communication devices that employees could use in case a collapse occurred. Conditions exposed employees to confined space hazards including engulfment and suffocation. Abatement Note: Abatement certification and documentation are required for this item (see enclosed "Sample Abatement-Certification Letter") Abatement Note: Employees are permitted to walk on the grain when cleaning out bottoms of bins, or for other purposes, without lifelines and harnesses when the employer has verified that the depth of the grain will not result in an engulfment hazard. However, with an 8 foot concave foundation, and depending upon the starting depth of the corn, caution is advised to ensure engulfment does not occur by using, e.g. measured markings of corn on the inside of the concave parts of the bins, through which, by observing the corn depth, the supervisor can make an qualified judgment that engulfment would not occur Employers shall not permit employees to enter silos whenever bridging conditions or grain funnelling (side building) exists. (Reference: CPL 02-01-004 - CPL 2-1.4C item J.5.k.). The employer also needs to verify that the employee will not be exposed to mechanical hazards. Abatement Note: Among other methods, one feasible and acceptable abatement method is to establish a valid PRCS program, assess the hazards of the PRCS, and either reclassify as non-PRCS, or follow PRCS procedures as referenced as a standard in 1910.146, 1910.272(g), and associated ANSI standards. Abatement Note: For reference, 1910.146 Appendix A, regarding lockout tagout, provides a decision flow chart through which the employer may be able to reclassify the space to a non- permit required confined space, on a case by case basis each time entrance is required, in which case items 8, 9, and 10 may not be required. The standard for General Industry Grain Handling Facilities, 1910.272(g), provides more specific guidance about the expectations for safe entry into grain storage facilities. Abatement Note: For reference, 1910.272(e), regarding grain handling facilities, discusses the importance of training in grain handling facilities, including cleaning procedures for grinding (flaking) equipment, clearing procedures for choked legs, housekeeping procedures, hot work procedures, preventative maintenance procedures, and lockout tagout procedures. Employees assigned special tasks, such as bin entry, shall be provided training to perform these tasks safely.
Recent events (2)
- — I (S) $1750.00
- — Z (S) $2500.00
1910.1200 F05
- Issued
- Abate by
- Penalty
- Initial $750.00 · Current $525.00 Reduced
Recent events (2)
- — I (O) $525.00
- — Z (S) $750.00
1928.57 C02
- Issued
- Abate by
- Penalty
- Initial $2500.00 · Current $1750.00 Reduced
Recent events (2)
- — I (S) $1750.00
- — Z (S) $2500.00
1928.57 C04
- Issued
- Abate by
- Penalty
- Initial $2500.00 · Current $1750.00 Reduced
Recent events (2)
- — I (S) $1750.00
- — Z (S) $2500.00
1928.57 C05
- Issued
- Abate by
- Penalty
- Initial $1250.00
Recent events (2)
- — I (S)
- — Z (S) $1250.00
More inspections in this industry (NAICS 112112)
GRAND VIEW, ID—2026-07-11 00:00:00
J. R. SIMPLOT COMPANY
ORLAND, CA—2026-07-01 00:00:00
MISSION LIVESTOCK
QUINCY, WA—2026-04-22 00:00:00
WA317990878 - BEEF NORTHWEST FEEDERS LLC
WARDEN, WA—2026-01-26 00:00:00
WA317989538 - BEEF NORTHWEST FEEDERS LLC
INDIANOLA, NE—2026-01-22 00:00:00
NA TIMMERMAN, INC
More inspections in CO
FORT COLLINS, CO—2026-07-16 00:00:00
GLOZER, LLC
BROOMFIELD, CO—2026-07-16 00:00:00
WAVELYNX TECHNOLOGIES LLC
COLORADO SPRINGS, CO—2026-07-15 00:00:00
ELMER CONTRACTOR LLC
SHERIDAN, CO—2026-07-15 00:00:00
JOHN'S COLLISION REPAIR, INC.
CENTENNIAL, CO—2026-07-15 00:00:00
BRAKES PLUS, INC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 309006898.