LIVERMORE, CA —
OSHA Inspection: DIABLO CREEK CONSTRUCTION, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of DIABLO CREEK CONSTRUCTION, INC. in 277 N. "L" STREET, TOFINO ROW, LIVERMORE, CA 94551 (NAICS 238130). OSHA activity number 310060397.
Where did this inspection happen?
- Establishment
- DIABLO CREEK CONSTRUCTION, INC.
- Site address
- 277 N. "L" STREET, TOFINO ROW
- City
- LIVERMORE
- State
- CA
- ZIP
- 94551
- Mailing
- 2678 N. MAIN STREET, SUITE 21, WALNUT CREEK, CA 94596
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- SIC code (legacy)
- 1751
- Employees
- 12
- Ownership type
- A
- Industry flags
- Construction safety.
Citations
9 citations on file for this inspection.
1509 A
- Issued
- Abate by
- Penalty
- Initial $450.00 · Current $250.00 Reduced
Recent events (3)
- — W (O) $250.00
- — I (O) $250.00
- — Z (O) $450.00
1629 B01 A
- Issued
- Abate by
- Penalty
- Initial $450.00 · Current $250.00 Reduced
Recent events (3)
- — W (O) $250.00
- — I (O) $250.00
- — Z (O) $450.00
3395 E03
- Issued
- Abate by
- Penalty
- Initial $450.00 · Current $250.00 Reduced
Recent events (3)
- — W (O) $250.00
- — I (O) $250.00
- — Z (O) $450.00
3668 D02
- Issued
- Abate by
- Penalty
- Initial $450.00 · Current $250.00 Reduced
Recent events (3)
- — W (O) $250.00
- — I (O) $250.00
- — Z (O) $450.00
1598 C
- Issued
- Abate by
- Penalty
- Initial $4050.00 · Current $1350.00 Reduced
Recent events (3)
- — W (S) $1350.00
- — I (S) $1350.00
- — Z (S) $4050.00
1621 A
- Issued
- Abate by
- Penalty
- Initial $5060.00 · Current $3375.00 Reduced
Recent events (3)
- — W (S) $3375.00
- — I (S) $3375.00
- — Z (S) $5060.00
1626 B
- Issued
- Abate by
- Penalty
- Initial $4050.00 · Current $335.00 Reduced
Recent events (3)
- — W (S) $335.00
- — I (S) $335.00
- — Z (S) $4050.00
1675 N
- Issued
- Abate by
- Penalty
- Initial $4050.00 · Current $335.00 Reduced
Recent events (3)
- — W (S) $335.00
- — I (S) $335.00
- — Z (S) $4050.00
17160002 F
- Issued
- Abate by
- Penalty
- Initial $4050.00 · Current $335.00 Reduced
Recent events (3)
- — W (S) $335.00
- — I (S) $335.00
- — Z (S) $4050.00
More inspections in this industry (NAICS 238130)
MOUNT JULIET, TN—2026-07-17 00:00:00
M AND F CONSTRUCTION LLC
MERIDIAN, ID—2026-07-17 00:00:00
CARRILLO CONSTRUCTION LLC
MERIDIAN, ID—2026-07-17 00:00:00
SEVY BROTHERS CONSTRUCTION LLC
WESTFORD, MA—2026-07-17 00:00:00
M&M CONSTRUCTION SERVICES CORP
FAIRHOPE, AL—2026-07-16 00:00:00
FRANCISCO ARIAS
More inspections in CA
DUCOR, CA—2026-07-18 00:00:00
VHN FLC, INC.
REEDLEY, CA—2026-07-18 00:00:00
THE GREAT VINE FLC, INC.
NAPA, CA—2026-07-17 00:00:00
BIANCHI CONCRETE AND PAVING
CONCORD, CA—2026-07-17 00:00:00
MT. DIABLO UNIFIED SCHOOL DISTRICT, CONCORD HIGH SCHOOL
COALINGA, CA—2026-07-17 00:00:00
GRANITE CONSTRUCTION CO.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 310060397.