Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,645Inspections Most recent open 2026-07-16 Last loaded 2026-07-20

OSHA Inspection: PIONEER CONSTRUCTION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of PIONEER CONSTRUCTION in 5859 ALRO PARK DR, POTTERVILLE, MI 48876 (NAICS 238120). OSHA activity number 313333114.

Watch Pioneer Construction — free Get an email when a new federal OSHA severe-injury report for Pioneer Construction is published. One employer, no account, unsubscribe in one click.
Site address
5859 ALRO PARK DR
City
POTTERVILLE
State
MI
ZIP
48876
Mailing
550 KIRTLAND ST SW, GRAND RAPIDS, MI 49507
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238120
SIC code (legacy)
1791
Employees
6
Ownership type
A
Industry flags
Construction safety.

2 citations on file for this inspection.

4084185106

Other-than-serious 1 instance 5 exposed
Issued
Abate by

4084186705

Other-than-serious 1 instance 5 exposed
Issued
Abate by

View PIONEER CONSTRUCTION's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 313333114.