OSHA Inspection: DICK GAUNT TRUCKING & EXCAVATING, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of DICK GAUNT TRUCKING & EXCAVATING, INC. in 605 S ORCHARD, MACKINAW, IL 61755 (NAICS 238910). OSHA activity number 331064485.

Watch Dick Gaunt Trucking & Excavating, INC. — free Get an email when a new federal OSHA severe-injury report for Dick Gaunt Trucking & Excavating, INC. is published. One employer, no account, unsubscribe in one click.
Site address
605 S ORCHARD
City
MACKINAW
State
IL
ZIP
61755
Mailing
2354 WASHINGTON ROAD, WASHINGTON, IL 61571
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238910
Employees
6
Ownership type
A

4 citations on file for this inspection.

1926.20 B01

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $2400.00 · Current $1680.00 Reduced
29 CFR 1926.20(b)(1):     The employer did not initiate and maintain accident prevention programs as necessary to comply with this part:    Employees were in an excavation attaching a chain to a metal rod attempting to pull it under the road as part of the bore process and the employer did not initiate and maintain an accident prevention program to control and eliminate the hazards present at the jobsite in accordance with OSHA regulations.
Recent events (2)
  • — I (S) $1680
  • — Z (S) $2400

1926.651 K01

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.651(k)(1):     Daily inspections of excavations, the adjacent areas, and protective systems were not made by a competent person for evidence of a situation that could have resulted in possible cave-ins, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions:    Employees were in an excavation attaching a chain to a metal rod attempting to pull it under the road as part of the bore process and the excavation was not inspected by a competent person before the employees were allowed to enter the working area and the excavation was not sloped, shored, or braced in accordance with the standard.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.651 C02

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $3600.00 · Current $2520.00 Reduced
29 CFR 1926.651(c)(2):     A stairway, ladder, ramp or other safe means of egress was not located in trench excavations that were 4 feet (1.22m) or more in depth so as to require no more than 25 feet (7.62m) of lateral travel for employees:    Employees were in an excavation at a depth up to 5.9 feet attaching a chain to a metal rod attempting to pull it under the road as part of the bore process and a safe means of egress was not located in the excavation.
Recent events (2)
  • — I (S) $2520
  • — Z (S) $3600

1926.652 A01

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $3600.00 · Current $2520.00 Reduced
29 CFR 1926.652(a)(1):     Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with paragraph (b) sloping and benching systems, or paragraph (c) support systems, shield systems, and other protective systems:    Employees were in an excavation at a depth up to 5.9 feet attaching a chain to a metal rod attempting to pull it under the road as part of the bore process and the excavation was not sloped, shored, or braced in accordance with the standard.
Recent events (2)
  • — I (S) $2520
  • — Z (S) $3600