MEDFORD, NJ —
OSHA Inspection: NEW BRITAIN STONE & STUCCO LLC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of NEW BRITAIN STONE & STUCCO LLC in 67 MOORLINCH BLVD, MEDFORD, NJ 08055 (NAICS 238140). OSHA activity number 331912683.
Where did this inspection happen?
- Establishment
- NEW BRITAIN STONE & STUCCO LLC
- Site address
- 67 MOORLINCH BLVD
- City
- MEDFORD
- State
- NJ
- ZIP
- 08055
- Mailing
- 9401 KIRKWOOD RD., PHILADELPHIA, PA 19114
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 5
- Ownership type
- A
Citations
8 citations on file for this inspection.
1926.20 B02
- Issued
- Abate by
- Penalty
- Initial $3000.00 · Current $1200.00 Reduced
General-duty citation text
29 CFR 1926.20(b)(2): 29 CFR 1926.20 (b)(2) The employer did not develop an accident prevention program, that provided for frequent and regular inspections of the job sites, materials, and equipment, to be made by competent persons designated by the employer. a)67 Moorlinch Blvd., Medford, NJ: Employees were exposed to multiple jobsite hazards. Workers onsite were observed installing the scratch-coat preliminary layer for the homes stucco finish. A worker was observed installing cement mixture on a 2nd floor dormer using the roof as his walking working surface. The worker traversed between the roof and a welded tubular frame scaffold via two unsupported scaffold planks. At no time was the employee provided with any means of fall protection (PFAS, positioning system, safety nets, guardrails, etc.). The employee was exposed to a fall hazard greater than 13 feet to the ground. Deficiencies noted in the scaffold including but were not limited to; work platforms not fully planked, overlapped planking not properly supported, improper and unstable foundations, and improper access to elevations. Additionally, Portland cement (a known corrosive) was noted was being used on the jobsite. No MSDS sheets or information was available to employees for this substance. The employer, New Britain Stone and Stucco, LLC, had not initiated a program for a competent person to conduct frequent and regular inspections of the jobsite, to identify hazards and/or stop the work in the event workers were placed in a hazardous condition. Observed on or about 02/07/2012 NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (3)
- — J (S) $1200
- — C (S) $3000
- — Z (S) $3000
1926.21 B02
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.21(b)(2): The employer did not instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his/her environment to control or eliminate any hazards or other exposure to illness or injury: a) 67 Moorlinch Blvd., Medford, NJ: Employees were exposed to multiple jobsite hazards. Workers onsite were observed installing the homes stucco finish using the roof as his walking working surface. The worker traversed between the roof and a tubular welded frame scaffold via two unsupported scaffold planks. At no time was the employee provided with any means of fall protection (PFAS, positioning system, safety nets, guardrails, etc.). The employee was exposed to a fall hazard greater than 13 feet to the ground. Deficiencies noted in the scaffold including but were not limited to; work platforms not fully planked, overlapped planking not properly supported, improper and unstable foundations, and improper access to elevations. Additionally it was noted that Portland cement (a known corrosive) was being used on the jobsite. No MSDS sheets or any information was available to employees for this substance. The employer did not instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his/her environment to control or eliminate any hazards or other exposure to illness or injury. Observed on or about 02/07/2012. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (3)
- — J (S) $0
- — C (S) $0
- — Z (S) $0
1926.451 B01
- Issued
- Abate by
- Penalty
- Initial $3000.00 · Current $1200.00 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) a) 67 Moorlinch Blvd., Medford, NJ: Employees were exposed to fall hazards while working from a tubular welded frame scaffold. A worker was observed traversing a scaffold on which each working level was not fully planked. The area that the employee was observed to be walking/working contained only two scaffold planks. Observed on or about 02/07/2012 NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (3)
- — J (S) $1200
- — C (S) $3000
- — Z (S) $3000
1926.451 C02 I
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(c)(2)(i): Footings were not level, sound, rigid, and capable of supporting the loaded scaffold without settling or displacement: a) 67 Moorlinch Blvd., Medford, NJ: Employees onsite were observed installing the scratch-coat preliminary layer for the home's stucco finish. The scaffold legs, with screw outs and mud plates were noted to bear on a piece of dimensional lumber that was unstable and incapable of supporting the scaffold without displacement due to bridging a large hole in the ground. The footing board, and thus the scaffold, was noted to flex and move as workers traversed the scaffold. Observed on or about 02/07/2012. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (3)
- — J (S) $0
- — C (S) $0
- — Z (S) $0
1926.451 E01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, sturcure, personnel hoist, or similar surface was not used. Crossbraces were used as a means of access. a) 67 Moorlinch Blvd., Medford, NJ: An employee was observed traversing a scaffold to which no proper means of access was provided. No ladders were positioned to provide access to the upper working surface. CSHO observed the employee dismounting the scaffold via climbing on the cross braces. Observed on or about 02/07/2012. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (3)
- — J (S) $0
- — C (S) $0
- — Z (S) $0
1926.451 G01
- Issued
- Abate by
- Penalty
- Initial $3000.00 · Current $0.00 Reduced
General-duty citation text
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level. a) 67 Moorlinch Blvd., Medford, NJ: Employee onsite was exposed to fall hazards while installing the scratch-coat preliminary layer for the home's stucco finish while the worker traversed between the roof and the tubular welded frame scaffold via two unsupported scaffold planks. The employee was exposed to a fall hazard greater than 13 feet to the ground. At no time while on the scaffold, was the employee provided with any means of fall protection (PFAS, positioning system, safety nets, guardrails, etc.). Observed on or about 02/07/2012. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (3)
- — J (S) $0
- — C (S) $3000
- — Z (S) $3000
1926.501 B13
- Issued
- Abate by
- Penalty
- Initial $4200.00 · Current $1680.00 Reduced
General-duty citation text
29 CFR 1926.501(b)(13): 29 CFR 1926.501 (b)(13) Each employee engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system. a) 67 Moorlinch Blvd., Medford, NJ: Employee was exposed to fall hazards while installing the scratch-coat preliminary layer for the home's stucco finish on a 2nd floor dormer using the roof as his walking working surface. The employee was exposed to a fall hazard greater than 13 feet to the ground. At no time was the employee provided with any means of fall protection (PFAS, positioning system, safety nets, Observed on or about 02/07/2012. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (3)
- — J (S) $1680
- — C (S) $4200
- — Z (S) $4200
1910.1200 H01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area: (Construction Reference: 1926.59) 67 Moorlinch Blvd., Medford, NJ: Workers onsite were observed installing the scratch-coat preliminary layer for the homes stucco finish using a mixture including Portland cement (a known corrosive). Employer did not provide employees with effective information and training on hazardous chemicals in their work area, nor were MSDS sheets or any other information available on-site to employees for this substance. Observed on or about 02/07/2012. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (3)
- — J (O) $0
- — C (O) $0
- — Z (O) $0
More inspections in this industry (NAICS 238140)
RENO, NV—2026-07-16 00:00:00
DC MASONRY
WINNETKA, IL—2026-07-15 00:00:00
CHICAGO STUCCO CO.
WINNETKA, IL—2026-07-15 00:00:00
CHICAGO STUCCO CO.
LODI, NJ—2026-07-15 00:00:00
J & O MASONRY CONTRACTORS
DORAVILLE, GA—2026-07-14 00:00:00
SUDLOW CONCRETE, INC.
More inspections in NJ
EAST ORANGE, NJ—2026-07-17 00:00:00
EAST ORANGE COMMUNITY CHARTER SCHOOL
EAST ORANGE, NJ—2026-07-17 00:00:00
EAST ORANGE COMMUNITY CHARTER SCHOOL
EAST ORANGE, NJ—2026-07-17 00:00:00
EAST ORANGE COMMUNITY CHARTER SCHOOL
MOUNTAIN LAKES, NJ—2026-07-17 00:00:00
JOHN CARUSO BUILDERS LLC
PENNINGTON, NJ—2026-07-16 00:00:00
BOROUGH OF PENNINGTON DEPARTMENT OF PUBLIC WORKS
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 331912683.