CHICAGO, IL —
OSHA Inspection: ZEE MASONRY CONSTRUCTION COMPANY
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of ZEE MASONRY CONSTRUCTION COMPANY in 1125 WELLINGTON AVE., CHICAGO, IL 60657 (NAICS 238140). OSHA activity number 332812403.
Where did this inspection happen?
- Establishment
- ZEE MASONRY CONSTRUCTION COMPANY
- Site address
- 1125 WELLINGTON AVE.
- City
- CHICAGO
- State
- IL
- ZIP
- 60657
- Mailing
- 4202 N. OLEANDER, HARWOOD HEIGHTS, IL 60706
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 4
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.451 C01
- Issued
- Abate by
- Penalty
- Initial $3000.00 · Current $1500.00 Reduced
General-duty citation text
29 CFR 1926.451(c)(1): Supported scaffold(s) with a height to base width (including outrigger supports) ratio greater than four to one (4:1) was not restrained from tipping by guying, tying, bracing, or equivalent means: a) Employees were exposed to fall hazards of greater than 25 feet while working on a frame scaffold which was not restrained from topping by any means. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $1500
- — Z (S) $3000
1926.451 G01
- Issued
- Abate by
- Penalty
- Initial $4200.00 · Current $2100.00 Reduced
General-duty citation text
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level was not protected from falling to that lower level: a) Employees working from frame scaffolding were exposed to fall hazards of greater than 25 feet. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $2100
- — Z (S) $4200
1926.416 E01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.416(e)(1): Worn or frayed electric cords or cables were used: a) Extension cords used by employees to power hand tool had been damaged and lacked insulation. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections in this industry (NAICS 238140)
RENO, NV—2026-07-16 00:00:00
DC MASONRY
WINNETKA, IL—2026-07-15 00:00:00
CHICAGO STUCCO CO.
WINNETKA, IL—2026-07-15 00:00:00
CHICAGO STUCCO CO.
LODI, NJ—2026-07-15 00:00:00
J & O MASONRY CONTRACTORS
DORAVILLE, GA—2026-07-14 00:00:00
SUDLOW CONCRETE, INC.
More inspections in IL
FRANKFORT, IL—2026-07-17 00:00:00
QUANTUM TECHNICAL SERVICES INC.
ROCK ISLAND, IL—2026-07-17 00:00:00
AUGUSTANA COLLEGE
WASHINGTON, IL—2026-07-17 00:00:00
SUNRUN INSTALLATION SERVICES, INC.
FOREST PARK, IL—2026-07-17 00:00:00
CONSERVATION OF SCULPTURE & OBJECTS STUDIO, INC.
BLUE ISLAND, IL—2026-07-17 00:00:00
PROFLOW PUMPING SOLUTIONS
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 332812403.