OSHA Inspection: MCNAUGHTON BROS. CONSTRUCTION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of MCNAUGHTON BROS. CONSTRUCTION in GREENVILLE STREET, HALLOWELL, ME 04347 (NAICS 237110). OSHA activity number 333989622.

Watch Mcnaughton Bros. Construction — free Get an email when a new federal OSHA severe-injury report for Mcnaughton Bros. Construction is published. One employer, no account, unsubscribe in one click.
Site address
GREENVILLE STREET
City
HALLOWELL
State
ME
ZIP
04347
Mailing
P. O. BOX 251, HALLOWELL, ME 04347
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237110
Employees
4
Ownership type
A

3 citations on file for this inspection.

1926.652 A01

Serious Gravity 10 3 instances 3 exposed
Issued
Penalty
Initial $2800.00 · Current $2240.00 Reduced
29 CFR 1926.652(a)(1):     Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652(b) or (c) of this section:    At the Jobsite - Employees working in an excavation was not protected from cave-ins by adequate protective systems designed in accordance with paragraph (b) or (c) of this standard.
Recent events (2)
  • — I (S) $2240
  • — Z (S) $2800

1926.20 B02

Serious Gravity 5 3 instances 3 exposed
Issued
Penalty
Initial $2400.00 · Current $1920.00 Reduced
29 CFR 1926.20(b)(2):     The employer did not initiate and maintain programs which provided for frequent and regular inspections of the job site, materials and equipment to be made by a competent person(s):    The employer did not inspect the trench before sending employees into the trench.
Recent events (2)
  • — I (S) $1920
  • — Z (S) $2400

1926.651 J02

Serious Gravity 1 3 instances 3 exposed
Issued
Penalty
Initial $1200.00 · Current $960.00 Reduced
29 CFR 1926.651(j)(2):     Protection was not provided by placing and keeping excavated or other materials or equipment at least 2 feet (.61m) from the edge of excavations, or by the use of retaining devices that were sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary:    At the Jobsite - The soil bank was not at least 2 feet from the ege of the excavation.
Recent events (2)
  • — I (S) $960
  • — Z (S) $1200

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 333989622.