OSHA Inspection: MECHANICAL SYSTEM COMPANY

Programmed Related inspection · Safety discipline

On , OSHA opened a programmed Related safety inspection of MECHANICAL SYSTEM COMPANY in 1904 WEST 35TH ST, AUSTIN, TX 78705 (NAICS 237110). OSHA activity number 334148228.

Watch Mechanical System Company — free Get an email when a new federal OSHA severe-injury report for Mechanical System Company is published. One employer, no account, unsubscribe in one click.
Site address
1904 WEST 35TH ST
City
AUSTIN
State
TX
ZIP
78705
Mailing
1654 FM 389, BRENHAM, TX 77833
Inspection type
Programmed Related (J)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237110
Employees
4
Ownership type
A

2 citations on file for this inspection.

1926.352 I

Serious Gravity 5 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $2000.00 · Current $1200.00 Reduced
29 CFR 1926.352(i):     Drums containers, or hollow structures which have contained toxic or flammable substances shall, before welding, cutting, or heating is undertaken on them, either be filled with water or thoroughly cleaned of such substances and ventilated and tested.     For welding/heating worked performed on the pvc pipe: On or about April 12, 2012, and at times prior thereto, the employer did not ensure that the pvc pipe being heated to make a bend was filled with water, cleaned, ventilated and tested, exposing the employees working in the area to the hazard of being struck-by flying debrias after the pipe exploded.
Recent events (2)
  • — I (S) $1200
  • — Z (S) $2000

1926.352 J

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.352(j):     Before heat is applied to a drum, container, or hollow structure, a vent or opening shall be provided for the release of any built-up pressure during the application of heat.    For welding/heating work performed on the PVC pipe: On or about April 12, 2012, and at times prior thereto, the employer did not ensure that the pvc pipe being heated to make a bend had a vent or opening to provide for the release of any built-up pressure, exposing the employee to the hazard of being struck by flying debris after the PVC pipe exploded.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

RNWBL

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 334148228.