GLENMONT, NY —
OSHA Inspection: PARK PLACE AT GLENMONT SQUARE, LLC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of PARK PLACE AT GLENMONT SQUARE, LLC. in PARK PLACE ROUTE 9W & HAGUE BLVD., GLENMONT, NY 12077 (NAICS 236116). OSHA activity number 335372785.
Where did this inspection happen?
- Establishment
- PARK PLACE AT GLENMONT SQUARE, LLC.
- Site address
- PARK PLACE ROUTE 9W & HAGUE BLVD.
- City
- GLENMONT
- State
- NY
- ZIP
- 12077
- Mailing
- 50 STATE STREET 6TH FLOOR, ALBANY, NY 12207
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236116
- Employees
- 8
- Ownership type
- A
Citations
2 citations on file for this inspection.
1926.501 B13
- Issued
- Abate by
- Penalty
- Initial $1600.00 · Current $950.00 Reduced
General-duty citation text
29 CFR 1926.501(b)(13): Employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system: Building 30, Second Story Floor Center of Building - on or about July 23, 2012 - no fall protection was available on the balcony floor. Elevation from the balcony floor to the ground was approximately 9 feet, 11-1/2 inches.
Recent events (2)
- — I (S) $950
- — Z (S) $1600
1926.503 A01
- Issued
- Abate by
- Penalty
- Initial $1600.00 · Current $950.00 Reduced
General-duty citation text
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards: Building 30, Second Story Floor Center of Building - on or about July 23, 2012 - the employer did not provide fall protection training to the employee that was installing framing lumber and floor sheeting on this part of the building. Elevation from the baclony floor to the ground was approximately 9 feet, 11-1/2 inches.
Recent events (2)
- — I (S) $950
- — Z (S) $1600
More inspections in this industry (NAICS 236116)
JAMAICA PLAIN, MA—2026-07-15 00:00:00
PERFORMANCE BUILDING COMPANY INC.
DELAVAN, WI—2026-07-15 00:00:00
TERONOMY BUILDERS, INC.
QUINCY, MA—2026-07-15 00:00:00
UNITEDWOR VM CONTRACTOR CORP
HONOLULU, HI—2026-07-15 00:00:00
CS BUILDER LLC
NEWTON, MA—2026-07-14 00:00:00
DELLBROOK CONSTRUCTION, LLC
More inspections in NY
LIBERTY, NY—2026-07-17 00:00:00
SULLIVAN COUNTY CARE CENTER AT SUNSET LAKE
NEW YORK, NY—2026-07-17 00:00:00
VERGARA ELECTRICAL LLC
ONEONTA, NY—2026-07-17 00:00:00
APPLE CONVERTING, INC.
SYRACUSE, NY—2026-07-17 00:00:00
NAMICELA HOME SOLUTIONS INC
SYRACUSE, NY—2026-07-17 00:00:00
CRANESVILLE BLOCK CO., INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 335372785.