OSHA Inspection: ZARZYCKI CONSTRUCTION, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ZARZYCKI CONSTRUCTION, LLC in 2 BERRY FARM ROAD, WHITEHOUSE STATION, NJ 08889 (NAICS 238170). OSHA activity number 335397592.

Watch Zarzycki Construction, LLC — free Get an email when a new federal OSHA severe-injury report for Zarzycki Construction, LLC is published. One employer, no account, unsubscribe in one click.
Site address
2 BERRY FARM ROAD
City
WHITEHOUSE STATION
State
NJ
ZIP
08889
Mailing
1019 OHIO AVENUE, TRENTON, NJ 08638
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238170
Employees
5
Ownership type
A

4 citations on file for this inspection.

1926.451 B02 I

Serious Gravity 10 1 instance 1 exposed
Issued
Penalty
Initial $2800.00 · Current $500.00 Reduced
29 CFR 1926.451(b)(2)(i):     Ladder jack scaffold, top plate bracket scaffold, roof bracket scaffold, and pump jack scaffold platform were not at least 12 inches wide:     a) On or about 07/24/12 CSHO observed a man working on and from pump jack when the walking/working platform was not a least 12 inches wide.
Recent events (3)
  • — R (S) $500
  • — C (S) $2800
  • — Z (S) $2800

1926.451 C02

Serious Gravity 10 1 instance 1 exposed
Issued
Penalty
Initial $2800.00 · Current $500.00 Reduced
29 CFR 1926.451(c)(2):     Supported scaffold poles, legs, post, frames, and uprights were not erected on base plate and mud sills, or other adequate firm foundation:    a) On or about 07/24/12 CSHO observed a man working on and from pump jack scaffold when it was not erected on base plates and mud sills or other adequate firm foundations.
Recent events (3)
  • — R (S) $500
  • — C (S) $2800
  • — Z (S) $2800

1926.451 F03

Serious Gravity 5 1 instance 1 exposed
Issued
Penalty
Initial $1600.00 · Current $500.00 Reduced
29 CFR 1926.451(f)(3):     Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity:    a) On or about 07/24/12 CSHO observed a man working on and from pump jack scaffold when the scaffold had not been inspected by a Competent Person before each work shift started.
Recent events (3)
  • — R (S) $500
  • — C (S) $1600
  • — Z (S) $1600

1926.451 G04 I

Serious Gravity 10 1 instance 1 exposed
Issued
Penalty
Initial $2800.00 · Current $500.00 Reduced
29 CFR 1926.451(g)(4)(i):     Guardrail systems were not installed along all open sides and ends of platforms:    a) On or about 07/24/12 CSHO observed a man working on and from pump jack scaffold when a guardrail system had not been installed along all open sides and ends of walking/working platforms.
Recent events (3)
  • — R (S) $500
  • — C (S) $2800
  • — Z (S) $2800

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 335397592.