ALLENTOWN, PA —
OSHA Inspection: SYNCREON TECHNOLOGY (AMERICA) INC
Follow-up inspection · Health discipline
At a glance
On , OSHA opened a follow-up health inspection of SYNCREON TECHNOLOGY (AMERICA) INC in 7384 PENN DR., ALLENTOWN, PA 18106 (NAICS 811219). OSHA activity number 335696191.
Where did this inspection happen?
- Establishment
- SYNCREON TECHNOLOGY (AMERICA) INC
- Site address
- 7384 PENN DR.
- City
- ALLENTOWN
- State
- PA
- ZIP
- 18106
- Mailing
- 7384 PENN DR., ALLENTOWN, PA 18106
What kind of inspection was it?
- Inspection type
- Follow-up (F)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 811219
- Employees
- 65
- Ownership type
- A
Citations
2 citations on file for this inspection.
1910.107 C04
- Issued
- Abate by
- Penalty
- Initial $2805.00 · Current $1964.00 Reduced
General-duty citation text
29 CFR 1910.107(c)(4): Electrical wiring and equipment did not conform to the provisions of to this paragraph and were not in accordance with subpart S of 29 CFR 1910: a) Paint Booth: The intrinsically safe lighting had a broken protective covering and was not maintained in a manner that would ensure safe operation in a hazardous location, on or about August 13, 2012. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1963.5
- — Z (S) $2805
1910.107 B05 I
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.107(b)(5)(i): The spray operations were not designed, installed, or maintained so that the average air velocity over the open face of the booth was not less than 100 linear feet per minute: a) Spray Room: The air velocity across the face of the paint booth was not maintained above 100 linear feet per minute, on or about August 13, 2012. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (O) $0
More inspections at SYNCREON TECHNOLOGY (AMERICA) INC
ALLENTOWN, PA—2013-08-06 00:00:00
SYNCREON TECHNOLOGY (AMERICA) INC
ALLENTOWN, PA—2012-08-13 00:00:00
SYNCREON TECHNOLOGY (AMERICA) INC
View SYNCREON TECHNOLOGY (AMERICA) INC's full OSHA safety record →
More inspections in this industry (NAICS 811219)
LYNCHBURG, VA—2026-06-11
IMAGEBRITE INC.
NEW CASTLE, PA—2026-05-28
CUSTOM VALVE REPAIR, LLC
NEW CASTLE, PA—2026-05-28
CUSTOM VALVE REPAIR, LLC
HARTFORD, CT—2026-05-13
ENVIRONMENTAL MONITOR SERVICE INC.
SPRINGVILLE, UT—2026-04-09
BURRANA, INC.
More inspections in PA
MILTON, PA—2026-07-10
HOMETOWN FOODS CHEF BOYARDEE CO.
SUNBURY, PA—2026-07-10
DEMPSEY UNIFORM & LINEN SUPPLY, INC
LANDISVILLE, PA—2026-07-10
FAIRVIEW DEMOLITION LLC
YORK, PA—2026-07-10
AMERICAN SPECIALTY SYSTEMS INC.
WILLIAMSPORT, PA—2026-07-10
INTERNATIONAL PAINT PROS
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 335696191.