ROCKAWAY, NJ —
OSHA Inspection: PLASTIFORM PACKAGING, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of PLASTIFORM PACKAGING, INC. in 114 BEACH STREET BUILDING 6, ROCKAWAY, NJ 07866 (NAICS 326199). OSHA activity number 336682398.
Where did this inspection happen?
- Establishment
- PLASTIFORM PACKAGING, INC.
- Site address
- 114 BEACH STREET BUILDING 6
- City
- ROCKAWAY
- State
- NJ
- ZIP
- 07866
- Mailing
- 114 BEACH STREET, ROCKAWAY, NJ 07866
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 326199
- Employees
- 22
- Ownership type
- A
Citations
2 citations on file for this inspection.
1910.147 C04 I
- Issued
- Abate by
- Penalty
- Initial $2000.00 · Current $1400.00 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) Establishment - 114 Beach Street, Rockaway, NJ: The employer's energy control procedure did not provide sufficient detail and specificity for employees to safely and effectively control energy sources during the servicing and maintenancing of equipment, such as but not limited to the Alloyd Blister Machine P-107. Violation occurred on or about 10/3/2012.
Recent events (2)
- — I (S) $1400
- — Z (S) $2000
1910.147 C06 I
- Issued
- Abate by
- Penalty
- Initial $2000.00 · Current $1400.00 Reduced
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) Establishment - 114 Beach Street, Rockaway, NJ: The employer did not conduct a periodic inspection of the energy control procedure on an annual basis to ensure compliance with the requirements of this standard. Violation occurred on or about 10/3/2012.
Recent events (2)
- — I (S) $1400
- — Z (S) $2000
More inspections at PLASTIFORM PACKAGING, INC.
ROCKAWAY, NJ—2016-10-18 00:00:00
PLASTIFORM PACKAGING, INC.
ROCKAWAY, NJ—2010-06-11 00:00:00
PLASTIFORM PACKAGING, INC.
View PLASTIFORM PACKAGING, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 326199)
CONNEAUT, OH—2026-07-13
CONTINENTAL STRUCTURAL PLASTICS
PETALUMA, CA—2026-07-10
LABCON NORTH AMERICA
KEEWATIN, MN—2026-07-09
111565 - TACKLE TAMER PRODUCTS INC
EAST FLAT ROCK, NC—2026-07-09
161517 - ELKAMET, INC.
LANESBOROUGH, MA—2026-07-08
LANSEN MOLD CO., INC.
More inspections in NJ
FREEHOLD, NJ—2026-07-10
MARIO & SONS CONSTRUCTION GROUP, LLC
FREEHOLD, NJ—2026-07-10
VACCA ROOFING
FREEHOLD, NJ—2026-07-10
SPECTRA PAINTING, INC
FREEHOLD, NJ—2026-07-10
CRAIG'S MASONRY & HARDSCAPE LLC
FREEHOLD, NJ—2026-07-10
GTN CONSTRUCTION INC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 336682398.