OSHA Inspection: MI-KEE-TRO METAL MANUFACTURING, INC.

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of MI-KEE-TRO METAL MANUFACTURING, INC. in 3466 BOARD ROAD, YORK, PA 17402 (NAICS 332322). OSHA activity number 338956741.

Watch Mi-Kee-Tro Metal Manufacturing, INC. — free Get an email when a new federal OSHA severe-injury report for Mi-Kee-Tro Metal Manufacturing, INC. is published. One employer, no account, unsubscribe in one click.
Site address
3466 BOARD ROAD
City
YORK
State
PA
ZIP
17402
Mailing
3466 BOARD ROAD, YORK, PA 17402
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332322
Employees
49
Ownership type
A

4 citations on file for this inspection.

1910.132 D02

Serious Gravity 1 1 instance 19 exposed
Issued
Abate by
Penalty
Initial $1785.00 · Current $1340.00 Reduced

Hazardous substances 0691

29 CFR 1910.132(d)(2): The employer did not verify that the required workplace hazard assessment has been performed through a written certification that identifies the workplace evaluated; the person certifying that the evaluation has been performed; the date(s) of the hazard assessment; and, which identifies the document as a certification of hazard assessment:    (a)  Mi-Kee-Tro Metal Manufacuring, Inc. - The employer did not develop a formal hazard assessment, on or about March 13, 2013.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $1340
  • — Z (S) $1785

1910.147 C04 I

Serious Gravity 5 1 instance 19 exposed
Issued
Abate by
Penalty
Initial $2380.00 · Current $1785.00 Reduced
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section:     (a) Mi-Kee-Tro Metal Manufacturing, Inc - The employer's Lockout/Tagout Program did not include machine specific procedures that clearly explain the process to be followed for each type of machine, i.e. press brakes, shears, and resistance welder, on or about March 13, 2013.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $1785
  • — Z (S) $2380

1910.1026 D01

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $2975.00 · Current $2230.00 Reduced

Hazardous substances 0691

29 CFR 1910.1026(d)(1): The employer who had a workplace or work operation covered by this section did not determine the 8-hour TWA exposure for each employee exposed to chromium (VI):     (a) Mi-Kee-Tro Metal Manufacturing, Inc. - The employer did not conduct an exposure assessment for the employees welding on the stainless steel which contained chromium, on or about March 13, 2013.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $2230
  • — Z (S) $2975

1910.95 M02 II E

Other-than-serious 1 instance 53 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00

Hazardous substances 8111

29 CFR 1910.95 (m)(2)(ii)(E): The employer's audiometric test records did not contain the employee's most recent noise exposure assessment:  (a)  Mi-Kee-Tro Metal Macufacturing, Inc. - The annual audiometric test records did not include the employee's most recent noise exposure assessment, on or about March 13, 2013.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.