HANOVER, PA —
OSHA Inspection: PRECISION CUT INDUSTRIES, INCORPORATED
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of PRECISION CUT INDUSTRIES, INCORPORATED in 115 RAM DRIVE, HANOVER, PA 17331 (NAICS 332322). OSHA activity number 339042251.
Where did this inspection happen?
- Establishment
- PRECISION CUT INDUSTRIES, INCORPORATED
- Site address
- 115 RAM DRIVE
- City
- HANOVER
- State
- PA
- ZIP
- 17331
- Mailing
- 115 RAM DRIVE, HANOVER, PA 17331
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332322
- Employees
- 88
- Ownership type
- A
Citations
10 citations on file for this inspection.
1910.147 C04 II B
- Issued
- Abate by
- Penalty
- Initial $2800.00 · Current $1960.00 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(ii)(B): The employer's procedures to be utilized for the control of hazardous energy did not include specific procedural steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy: (a) Precision Cut Industries, Incorporated - The employer had not developed machine specific energy control procedures for each piece of equipment, such as the hydraulic press brakes, on or about May 2, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1960
- — Z (S) $2800
1910.147 C06 I
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard were being followed: (a) Precision Cut Industries, Incorporated - The employer did not conduct an internal audit to ensure de-energization procedures were being properly implemented, on or about May 2, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C07 I
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(c)(7)(i): The employer did not provide training to ensure that the purpose and function of the energy control program was understood by employees in accordance with the training elements listed under sections A-C of this section: (a) Precision Cut Industries, Incorporated - The employer did not provide training to affected and other employees, on or about May 2, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C07 IV
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(c)(7)(iv): The employer did not certify that employee training had been accomplished and was being kept up to date: (a) Precision Cut Industries, Incorporated - The employer did not certify training had been completed for one of the maintenance employees, on or about May 2, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 D04 I
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(d)(4)(i): Lockout or tagout devices were not affixed to each energy isolating device by authorized employees: (a) Precision Cut Industries, Incorporated - Employees did not lockout the press brakes and use safety blocks while changing the dies, on or about May 2, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.157 G02
- Issued
- Abate by
- Penalty
- Initial $2100.00 · Current $1470.00 Reduced
General-duty citation text
29 CFR 1910.157(g)(2): The educational program to familiarize employees with the general principles of fire extinguisher use and the hazards involved with incipient stage firefighting was not provided to all employees upon initial employment, and at least annually thereafter: (a) Precision Cut Industries, Incorporated - The employer did not provide fire extinguisher training upon initial employment and annually thereafter, on or about May 2, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1470
- — Z (S) $2100
1910.215 A04
- Issued
- Abate by
- Penalty
- Initial $2100.00 · Current $1470.00 Reduced
General-duty citation text
29 CFR 1910.215(a)(4): Work rests were not kept adjusted closely to the wheel with a maximum opening of one-eighth inch to prevent the work from being jammed between the wheel and the rest, which might cause wheel breakage: (a) Building One; Welding Area - The Porter Cable Bench Grinder did not have the work rests adjusted to within one-eighth inch from the wheels, on or about May 2, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement
Recent events (2)
- — I (S) $1470
- — Z (S) $2100
1910.215 B09
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.215(b)(9): Safety guards of the types described in Subparagraphs (3) and (4) of this paragraph, where the operator stands in front of the opening, were not constructed so that the peripheral protecting member could be adjusted to the constantly decreasing diameter of the wheel: (a) Building One; Welding Area - The Porter Cable Bench Grinder was not equipped with tongue guards, on or about May 2, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.212 A03 II
- Issued
- Abate by
- Penalty
- Initial $5600.00 · Current $3600.00 Reduced
General-duty citation text
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): (a) Building Number One; Press Brake Areas - The TrumaBend V130 press brake did not have point of operation guarding. The operator used the foot pedal to cycle the press instead of the two-hand control mechanism. When a helper was needed to bend product, only one of the employees had control of the foot pedal, on or about May 2, 2013. (b) Building Number One; Press Brake Areas - The Cincinnati 175 ton press brake did not have point of operation guarding. The operator used the foot pedal to cycle the press instead of the two-hand control mechanism. When a helper was needed to bend product, only one of the employees had control of the foot pedal, on or about May 9, 2013. (c) Building Number Two; Press Brake Areas - The TrumaBend C120 press brake did not have point of operation guarding. The operator used the foot pedal to cycle the press instead of the two-hand control mechanism, on or about May 9, 2013. THE PRECISION CUT INDUSTRIES, INCORPORATED WAS PREVIOUSLY CITED FOR A VIOLATION OF THIS OCCUPATIONAL SAFETY AND HEALTH STANDARD OR ITS EQUIVALENT STANDARD 29 CFR 1910.212(A)(3)(II), WHICH WAS CONTAINED IN OSHA INSPECTION NUMBER 314239070, CITATION NUMBER 1, ITEM NUMBER 1, AND WAS AFFIRMED AS A FINAL ORDER ON MAY 21, 2010, WITH RESPECT TO A WORKPLACE LOCATED AT 115 RAM DRIVE, HANOVER, PENNSYLVANIA, 17331. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (R) $3600
- — Z (R) $5600
1910.134 C02 II
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
9135
General-duty citation text
29 CFR 1910.134(c)(2)(ii): Where respirator use was not required, the employer did not establish and implement those elements of a written respiratory protection program necessary to ensure that any employee using a respirator voluntarily was medically able to use that respirator, and that the respirator was cleaned, stored, and maintained so that its use did not present a health hazard to the user: (a) Precision Cut Industries, Incorporated - The employer did not establish and implement a written respiratory protection program that included medical evaluations and guidelines on maintaining the respirator for employee(s) who voluntarily wore a half mask respirator when cleaning the laser dust collectors, on or about May 2, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at PRECISION CUT INDUSTRIES, INCORPORATED
HANOVER, PA—2010-04-28 00:00:00
PRECISION CUT INDUSTRIES, INCORPORATED
View PRECISION CUT INDUSTRIES, INCORPORATED's full OSHA safety record →
More inspections in this industry (NAICS 332322)
CASTLE ROCK, CO—2026-07-10
MASTER MAGNETICS, INC.
PITTSBURG, KS—2026-07-09
PROGRESSIVE PRODUCTS INC
NEW ROCHELLE, NY—2026-07-09
HEFTI HARBOR ELEC FAB & TOOLS
LAKEWOOD, WA—2026-07-08
WA317992020 - KRUEGER SHEET METAL CO
SOUTHAMPTON, MA—2026-07-07
LYMAN SHEET METAL CO., INC
More inspections in PA
MILTON, PA—2026-07-10
HOMETOWN FOODS CHEF BOYARDEE CO.
SUNBURY, PA—2026-07-10
DEMPSEY UNIFORM & LINEN SUPPLY, INC
LANDISVILLE, PA—2026-07-10
FAIRVIEW DEMOLITION LLC
YORK, PA—2026-07-10
AMERICAN SPECIALTY SYSTEMS INC.
WILLIAMSPORT, PA—2026-07-10
INTERNATIONAL PAINT PROS
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339042251.