On , OSHA opened a planned safety inspection of PRECISION PROCESS INC in 2111 LIBERTY DRIVE, NIAGARA FALLS, NY 14304 (NAICS 333298). OSHA activity number 339526931.

Watch Precision Process INC — free Get an email when a new federal OSHA severe-injury report for Precision Process INC is published. One employer, no account, unsubscribe in one click.
Site address
2111 LIBERTY DRIVE
City
NIAGARA FALLS
State
NY
ZIP
14304
Mailing
2111 LIBERTY DRIVE, NIAGARA FALLS, NY 14304
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
333298
Employees
57
Ownership type
A

5 citations on file for this inspection.

1910.36 H02

Serious Gravity 1 1 instance 33 exposed
Issued
Abate by
Penalty
Initial $1575.00 · Current $1000.00 Reduced
29 CFR 1910.36(h)(2): Outdoor exit route(s) were not covered where snow or ice was likely to accumulate.  (Exception: Not required where employer can demonstrate that snow or ice will be removed before it can present a hazard)      a) On or about 12/18/13, in the machine shop's north exits, two outdoor exit routes were blocked by accumulated snow.        ABATEMENT CERTIFICATION REQUIRED
Recent events (2)
  • — I (S) $1000
  • — Z (S) $1575

1910.147 C04 I

Serious Gravity 5 4 instances 3 exposed
Issued
Abate by
Penalty
Initial $2625.00 · Current $1600.00 Reduced
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section:      a) On or about 12/18/13, in the production areas, employer did not develop and document machine-specific lockout/tagout procedures for Bruderer Stamping Presses.    b) On or about 12/18/13, in the production areas, a lockout/tagout procedure was not utilized when changing dies on the Bruderer Stamping Presses.    c) On or about 12/18/13, in the production areas, a lockout/tagout procedure was not utilized when unjamming parts inside the Bruderer Stamping Presses.     d) On or about 12/18/13, in the production areas, a lockout/tagout procedure was not utilized when changing blades on a Peerless Horizontal Band Saw.      ABATEMENT CERTIFICATION REQUIRED
Recent events (2)
  • — I (S) $1600
  • — Z (S) $2625

1910.147 C06 I

Serious Gravity 5 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $2625.00 · Current $1600.00 Reduced
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed:      a) On or about 12/18/13, in the establishment, employer did not conduct periodic inspections of their machine-specific lockout/tagout procedures for machines such as, but not limited to: Mazak CNC Mills, CNC Lathes and Horizontal Band Saws since 10/04/2010.       ABATEMENT CERTIFICATION REQUIRED
Recent events (2)
  • — I (S) $1600
  • — Z (S) $2625

1910.215 B09

Serious Gravity 1 1 instance 2 exposed
Issued
Penalty
Initial $1339.00 · Current $800.00 Reduced
29 CFR 1910.215(b)(9): The distance between the abrasive wheel periphery(s) and the adjustable tongue or the end of the safety guard peripheral member at the top exceeded one fourth inch:      a) On or about 12/18/13, in the manual machine shop area, a Dayton 10" Bench Grinder's tongue guard was adjusted to 3/4 inch.     NO ABATEMENT CERTIFICATION REQUIRED
Recent events (2)
  • — I (S) $800
  • — Z (S) $1339

1910.242 B

Serious Gravity 5 8 instances 7 exposed
Issued
Abate by
Penalty
Initial $2100.00 · Current $1200.00 Reduced
29 CFR 1910.242(b): Compressed air used for cleaning purposes was not reduced to less than 30 p.s.i.:      On or about 12/18/13, in the machine shop areas, compressed air hoses used to clean chips and coolant off parts inside the CNC Mills, CNC Lathes, Manual Mills and Manual Lathes were above 30 p.s.i. as follows:    a) Mazak CNC Lathe #058's compressed air hose was used at 50 p.s.i.    b) Mazak CNC Mill #002's compressed air hose was used between 50-60 p.s.i.    c) Mazak CNC Mill #004's compressed air hose was used at 70 p.s.i.    d) Mazak CNC Mill #5000's compressed air hose was used at 60 p.s.i.    e) Mazak CNC Mill #001's compressed air hose was used at 70 p.s.i.    f) Millport Manual Mill #7's compressed air hose was used at 70 p.s.i.    h) Acer Manual Mill #29's compressed air hose was used at 50 p.s.i.    i) Manual Lathe #12's compressed air hose was used at 80 p.s.i.      ABATEMENT CERTIFICATION REQUIRED
Recent events (2)