CARRABASSETT VALLEY, ME —
OSHA Inspection: LAKE REGION BUILDERS, INC.
Unprogrammed Related inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Related safety inspection of LAKE REGION BUILDERS, INC. in ALLAGASH DRIVE, CARRABASSETT VALLEY, ME 04947 (NAICS 236116). OSHA activity number 339872723.
Where did this inspection happen?
- Establishment
- LAKE REGION BUILDERS, INC.
- Site address
- ALLAGASH DRIVE
- City
- CARRABASSETT VALLEY
- State
- ME
- ZIP
- 04947
- Mailing
- P.O. BOX 473, RANGELEY, ME 04970
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236116
- Employees
- 3
- Ownership type
- A
Citations
4 citations on file for this inspection.
1926.416 B02
- Issued
- Abate by
- Penalty
- Initial $1600.00 · Current $800.00 Reduced
General-duty citation text
29 CFR 1926.416(b)(2): Working spaces, walkways, and similar locations were not kept clear of cords which created a hazard to employees: Sugarloaf, Timberline Job Site - Electrical cords were located in the middle of two of the four sets of stairs leading into the building.
Recent events (2)
- — I (S) $800
- — Z (S) $1600
1926.1052 C01
- Issued
- Abate by
- Penalty
- Initial $1600.00 · Current $800.00 Reduced
General-duty citation text
29 CFR 1926.1052(c)(1): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with at least one handrail: Sugarloaf, Timberline Job Site - The set of stairs going from the first to the second story was not equipped with a handrail.
Recent events (2)
- — I (S) $800
- — Z (S) $1600
1926.403 B02
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.403(b)(2): Listed, labeled, or certified equipment was not installed and used in accordance with instructions included in the listing, labeling, or certification: Sugarloaf, Timberline Phase 2 Job Site - A power strip was not being used in accordance with its listing and labeling.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1926.405 G02 IV
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.405(g)(2)(iv): Flexible cords were not connected to devices and fittings so that strain relief is provided to prevent pull from being directly transmitted to joints or terminal screws: Sugarloaf, Timberline Job Site - The cord on the Makita chop saw was not connected to a fitting so that strain relief was provided.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections in this industry (NAICS 236116)
DELAVAN, WI—2026-07-15 00:00:00
TERONOMY BUILDERS, INC.
QUINCY, MA—2026-07-15 00:00:00
UNITEDWOR VM CONTRACTOR CORP
NEWTON, MA—2026-07-14 00:00:00
DELLBROOK CONSTRUCTION, LLC
NEWTON, MA—2026-07-14 00:00:00
GARDEN HOMES
LITTLETON, CO—2026-07-13 00:00:00
PLATTE CAPITAL PROJECTS, INC.
More inspections in ME
AUGUSTA, ME—2026-07-14 00:00:00
JJ GONZALEZ ROOFING AND GUTTERS
DOVER FOXCROFT, ME—2026-07-14 00:00:00
REDI-ROCK OF CENTRAL MAINE
BENTON, ME—2026-07-13 00:00:00
LEN POULIN, INC.
PORTLAND, ME—2026-07-06 00:00:00
NEW ENGLAND REHABILITATION HOSPITAL OF PORTLAND
DOVER FOXCROFT, ME—2026-07-06 00:00:00
SHAW'S SUPERMARKETS
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339872723.