YIGO, GU —
OSHA Inspection: CHELU JUNG CONSTRUCTION CORPORATION
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of CHELU JUNG CONSTRUCTION CORPORATION in CHALAN FLORES, YIGO, GU 96929 (NAICS 238990). OSHA activity number 340327477.
Where did this inspection happen?
- Establishment
- CHELU JUNG CONSTRUCTION CORPORATION
- Site address
- CHALAN FLORES
- City
- YIGO
- State
- GU
- ZIP
- 96929
- Mailing
- P.O. BOX 25221, GMF, BARRIGADA, GU 96921
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238990
- Employees
- 11
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.100 A
- Issued
- Abate by
- Penalty
- Initial $1020.00 · Current $1020.00
General-duty citation text
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns, were not be protected by protective helmets: a. On February 10, 2015, at ground level and on the roof, employees handling, swinging, lifting, and moving rebar were not protected with protective helmets.
Recent events (1)
- — Z (S) $1020
1926.501 B13
- Issued
- Abate by
- Penalty
- Initial $1360.00 · Current $1360.00
General-duty citation text
29 CFR 1926.501(b)(13): Each employee engaged in residential construction activities 6 feet or more above lower levels was not protected by guardrail systems, safety net system, or personal fall arrest system unless another provision in paragraph (b) of this section provides for an alternative fall protection measure: a. On February 10, 2015, on the roof on the front side of the house, employees were not protected from falling from the roof when bringing rebar up to the roof level handed to them from employees on ground level, exposing employees to the hazard of falling from a height of 10.66 feet.
Recent events (1)
- — Z (S) $1360
1926.703 A02
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.703(a)(2): Drawings or plans, including all revisions, for the jack layout, formwork (including shoring equipment), working decks, and scaffolds, were not available at the jobsite: a. On February 10, 2015, there were no drawings or plans for jack layout, formwork including shoring equipment, working decks, and scaffolds.
Recent events (1)
- — Z (O) $0
More inspections at CHELU JUNG CONSTRUCTION CORPORATION
SANTA RITA, GU—2013-05-31 00:00:00
CHELU JUNG CONSTRUCTION CORPORATION
MANGILAO, GU—2011-10-26 00:00:00
CHELU JUNG CONSTRUCTION CORPORATION
MANGILAO, GU—2011-02-09 00:00:00
CHELU JUNG CONSTRUCTION CORPORATION
View CHELU JUNG CONSTRUCTION CORPORATION's full OSHA safety record →
More inspections in this industry (NAICS 238990)
NEW YORK, NY—2026-07-09
PALM INDUSTRIES LLC
NEW YORK, NY—2026-07-09
PALM INDUSTRIES LLC
EL PASO, TX—2026-07-09
RM CRANE & RIGGING LLC.
LAKEWOOD, WA—2026-07-08
WA317992018 - HARMON INC DBA HARMON SERVICE GLAZING INC
VICTOR, NY—2026-07-08
DIMARCO CONSTRUCTORS
More inspections in GU
BARRIGADA, GU—2026-01-22
DURI CORPORATION
TAMUNING, GU—2026-01-21
DLR CORPORATION
BARRIGADA, GU—2026-01-21
DURI CORPORATION
TAMUNING, GU—2026-01-20
MG CONSTRUCTION COMPANY
BARRIGADA, GU—2026-01-20
PFM -VERTEX-LMS
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340327477.