OSHA Inspection: CHELU JUNG CONSTRUCTION CORPORATION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of CHELU JUNG CONSTRUCTION CORPORATION in CHALAN FLORES, YIGO, GU 96929 (NAICS 238990). OSHA activity number 340327477.

Watch Chelu Jung Construction Corporation — free Get an email when a new federal OSHA severe-injury report for Chelu Jung Construction Corporation is published. One employer, no account, unsubscribe in one click.
Site address
CHALAN FLORES
City
YIGO
State
GU
ZIP
96929
Mailing
P.O. BOX 25221, GMF, BARRIGADA, GU 96921
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238990
Employees
11
Ownership type
A

3 citations on file for this inspection.

1926.100 A

Serious Gravity 1 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $1020.00 · Current $1020.00
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns, were not be protected by protective helmets:    a. On February 10, 2015, at ground level and on the roof, employees handling, swinging, lifting, and moving rebar were not protected with protective helmets.
Recent events (1)
  • — Z (S) $1020

1926.501 B13

Serious Gravity 5 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $1360.00 · Current $1360.00
29 CFR 1926.501(b)(13): Each employee engaged in residential construction activities 6 feet or more above lower levels was not protected by guardrail systems, safety net system, or personal fall arrest system unless another provision in paragraph (b) of this section provides for an alternative fall protection measure:    a. On February 10, 2015, on the roof on the front side of the house, employees were not protected from falling from the roof when bringing rebar up to the roof level handed to them from employees on ground level, exposing employees to the hazard of falling from a height of 10.66 feet.
Recent events (1)
  • — Z (S) $1360

1926.703 A02

Other-than-serious 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.703(a)(2): Drawings or plans, including all revisions, for the jack layout, formwork (including shoring equipment), working decks, and scaffolds, were not available at the jobsite:    a. On February 10, 2015, there were no drawings or plans for jack layout, formwork including shoring equipment, working decks, and scaffolds.