WASHINGTON, DC —
OSHA Inspection: ERIC DACOSTA CONSTRUCTION
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of ERIC DACOSTA CONSTRUCTION in 3411 20TH STREET NE, WASHINGTON, DC 20018 (NAICS 236115). OSHA activity number 340644962.
Where did this inspection happen?
- Establishment
- ERIC DACOSTA CONSTRUCTION
- Site address
- 3411 20TH STREET NE
- City
- WASHINGTON
- State
- DC
- ZIP
- 20018
- Mailing
- 5409 QUEENSBERRY AVE, SPRINGFIELD, VA 22151
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236115
- Employees
- 5
- Ownership type
- A
Citations
2 citations on file for this inspection.
1926.501 B13
- Issued
- Abate by
- Penalty
- Initial $2000.00 · Current $2000.00
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): a) Front of Structure, Second Floor, Extension Roof - Two workers were not protected from falling approximately 10' to the plywood awning below which is approximately 12' above the ground, on or about 5/14/2015. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $2000
1926.1053 B01
- Issued
- Penalty
- Initial $1360.00 · Current $1360.00
General-duty citation text
29 CFR 1926.1053(b)(1): Where portable ladders were used for access to an upper landing surface and the ladder's length allows, the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface being accessed: a) Second Floor, Center of Structure - Ladder used to gain access to the third floor level extended approximately 12" past the landing level on or about 5/14/2015.
Recent events (1)
- — Z (S) $1360
More inspections in this industry (NAICS 236115)
PACIFIC PALISADES, CA—2026-07-17 00:00:00
BLUE LABEL CONSTRUCTION, INC.
SHAVER LAKE, CA—2026-07-17 00:00:00
LEVON ZEKIAN
MERIDIAN, ID—2026-07-17 00:00:00
CBH HOMES
PHILADELPHIA, PA—2026-07-16 00:00:00
CENTER CITY CONSTRUCTION AND DEVELOPMENT, LLC
PHILADELPHIA, PA—2026-07-16 00:00:00
OLD COUNTRY CONSTRUCTION, LLC
More inspections in DC
WASHINGTON, DC—2026-06-30 00:00:00
U.S. DEPARTMENT OF AGRICULTURE
WASHINGTON, DC—2026-06-16 00:00:00
MACY'S
WASHINGTON, DC—2026-06-02 00:00:00
RIGO MULTISERVICES
WASHINGTON, DC—2026-06-02 00:00:00
DDC CPL LLC
WASHINGTON, DC—2026-06-02 00:00:00
DDC CPL LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340644962.