OSHA Inspection: NORTHWEST FOAM PRODUCTS, INC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of NORTHWEST FOAM PRODUCTS, INC in 642 GRANGE LANE, TWIN FALLS, ID 83301 (NAICS 326150). OSHA activity number 342092798.

Watch Northwest Foam Products, INC — free Get an email when a new federal OSHA severe-injury report for Northwest Foam Products, INC is published. One employer, no account, unsubscribe in one click.
Site address
642 GRANGE LANE
City
TWIN FALLS
State
ID
ZIP
83301
Mailing
2390 ROSTRON CIRCLE, TWIN FALLS, ID 83301
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
326150
Employees
19
Ownership type
A

15 citations on file for this inspection.

5(a)(1)

Serious Gravity 5 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $4346.00 · Current $2173.00 Reduced
OSH ACT of 1970 Section (5)(a)(1): The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm in that employees were exposed to the hazard of being thrown from, pinned under, or crushed by a powered industrial truck (forklift) when operating the equipment without a seat belt:  a) Jobsite: On February 9, 2017 and at times prior thereto employees operated several powered industrial trucks (forklifts) with various attachments in place, through-out the company facilities.  Employees were not required to use the seatbelt.     Note) Certification of corrective action is required for this item.
Recent events (2)
  • — I (S) $2173
  • — Z (S) $4346

1910.178 L02 II

Serious Gravity 5 1 instance 8 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.178(l)(2)(ii): Powered industrial truck training did not consist of a combination of formal instruction (e.g., lecture, discussion, interactive computer learning, video tape, written material), practical training (demonstrations performed by the trainer and practical exercises performed by the trainee), and evaluation of the operator's performance in the workplace:  a) Building 1, building 3, and building 4: On February 9, 2017 and at times prior thereto employees operated powered industrial trucks (forklifts) daily to handle bags of foam product beads, move and stack blocks of foam that measured up to 16 feet high, and weighed between an estimated 190 to 350 pounds.   The employer had not maintained a powered industrial truck program that provided training, certification, and re-certification since 1997.      Note) Certification of corrective action is required for this item.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.147 C01

Serious Gravity 5 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $2897.00 · Current $1449.00 Reduced
29 CFR 1910.147(c)(1): The employer did not establish a program consisting of energy control procedures, employee training and periodic inspections to ensure that before any employee performs any servicing or maintenance on a machine or equipment where the unexpected energizing, startup or release of stored energy could occur and cause injury, the machine or equipment would be isolated from the energy source and rendered inoperative:   a) Facility: On February 9, 2017 and at times prior thereto the employer had not developed, implemented or maintained an energy control program that was relative to the current machinery in use.  Specific, written procedures that identified all of the hazardous energy sources, how and where to control them were not developed.  Training for authorized and affected employees was not current.  Periodic inspections were not conducted and certified respective to the current machinery.  Employees performed, or assisted in the performance of scheduled and unscheduled servicing and/or maintenance on machinery that included but may not be limited to the fan fold & cutoff system and the Nuova idro-press block moulding machine.     Note) Certification of corrective action is required for this item.
Recent events (2)
  • — I (S) $1448.5
  • — Z (S) $2897

1910.147 F02 I

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.147(f)(2)(i): Whenever outside servicing personnel were engaged in activities covered by the scope and application of this standard, the on-site employer and the outside employer had not informed each other of their respective lockout or tag-out procedures:  a) Facility: On February 9, 2017 and at times prior thereto a formal energy control program with specific procedures that identified all of the hazardous energy sources, how and where to control them, was not available to share with outside servicing personnel.  Outside contractors worked on machines that included, but may not be limited to, the fanfold & cutoff system, and Nuova idro-press.     Note) Certification of corrective action IS required for this item.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.219 C04 I

Serious Gravity 5 1 instance 6 exposed
Issued
Abate by
Penalty
Initial $2897.00 · Current $1449.00 Reduced
29 CFR 1910.219(c)(4)(i): Projecting shaft ends did not present a smooth end and projected more than one-half the diameter of the shaft were not guarded by non-rotating caps or safety sleeves:  a) Building 1: On February 9, 2017 and at times prior thereto employees were not protected from various projecting, rotating shafts on the grinding unit for recycled materials.   b) Building 4: On February 9, 2017 and at times prior thereto employees were not protected from a projecting, rotating shaft with a notch out of it, on the GP 4000 Slabbing System, foam down cutter machine.        Note) Certification of corrective action is required for this item.
Recent events (2)
  • — I (S) $1448.5
  • — Z (S) $2897

1910.219 D01

Serious Gravity 5 1 instance 6 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.219(d)(1): Pulleys and any part of, which were seven (7) feet or less from the floor or working platform, were not guarded in accordance with the standards specified in paragraphs (m) and (o) of this section:  a) Building 4: On February 9, 2017 and at times prior thereto, employees were exposed to the ingoing nip point of a wheel and pulley assembly on the stretch wrapper machine.   Note) Standard guards in paragraph (m) include expanded metal, perforated or solid sheet metal, wire mesh on a frame of angle iron, or iron pipe securely fastened to the frame of the machine.           Note) Certification of corrective action is required for this item.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.219 F03

Serious Gravity 5 1 instance 17 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.219(f)(3): All sprocket wheels and chains were not enclosed unless they were more than seven (7) feet above the floor or platform:   a) Building 4: On February 9, 2017 and at times prior thereto employees were exposed to unguarded chains and sprocket assemblies when using the stretch wrapper.  At each end of the stretch wrapper, an expanded metal enclosure was in place on three sides of various sized chain and sprocket assemblies, leaving the side closet to the operator unguarded.      b) Building 4: On February 9, 2017 and at times prior thereto employees were exposed to unguarded chains and sprockets at all four corners of the valley machine.   Note) Certification of corrective action is required for this item.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.303 B01

Serious Gravity 5 1 instance 6 exposed
Issued
Abate by
Penalty
Initial $2897.00 · Current $1449.00 Reduced
29 CFR 1910.303(b)(1): Electric equipment was not free from recognized hazards that were likely to cause death or serious physical harm to employees:  a) Building 4: On February 9, 2017 and at times prior thereto energized copper wires were exposed at the terminal on the foam down cutter machine.   Note) Certification of corrective action is required for this item.
Recent events (2)
  • — I (S) $1448.5
  • — Z (S) $2897

1910.303 B07

Serious Gravity 5 1 instance 12 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.303(b)(7): Electric equipment was not installed in a neat and workmanlike manner:  a) Building 4: On February 9, 2017 and at times prior thereto a 480 volt energized junction box was left on the floor under the foam down cutter machine.  The box was not marked to identify its purpose or rating.  The box was also missing knockout plugs.   b) Building 4: On February 9, 2017 and at times prior thereto two 480 volt energized power boxes were not mounted/secured to the rack they were set on.    c) Building 4: On February 9, 2017 and at times prior thereto two 480 volt energized power boxes were not were not marked to identify their purpose or rating.       Note) Certification of corrective action is required for this item.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.305 B01 II

Serious Gravity 5 1 instance 6 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.305(b)(1)(ii): Unused openings in cabinets, boxes, and fittings shall be effectively closed.  a) Building 4: On February 9, 2017 and at times prior thereto a knockout plug was missing from a 480 volt energized junction box left on the floor under the down cutter machine.     Note) Certification of corrective action is required for this item.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.305 B02 I

Serious Gravity 5 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.305(b)(2)(i): All pull boxes, junction boxes, and fittings were not provided with covers identified for the purpose:  a) Building 4: On February 9, 2017 and at times prior thereto an energized junction box mounted on the wall behind the down cutter, was missing a cover plate.    Note) Certification of corrective action is required for this item.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.303 B02

Serious Gravity 1 1 instance 6 exposed
Issued
Abate by
Penalty
Initial $2173.00 · Current $1087.00 Reduced
29 CFR 1910.303(b)(2): Listed or labeled equipment was not installed and used in accordance with any instructions included in the listing or labeling:  a) Building 1: On February 9, 2017 and at times prior thereto a flexible cord was used with a mounted 2 way outlet box on the air injecting bed machine.      b) Building 4: On February 9, 2017 and at times prior thereto flexible cords were used with the junction box on the stretch wrapper.        Note) Certification of corrective action is required for this item.
Recent events (2)
  • — I (S) $1086.5
  • — Z (S) $2173

1910.305 G01 IV A

Serious Gravity 1 1 instance 7 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and cables were used as a substitute for the fixed wiring of a structure:  a) Building 4: On February 9, 2017 and at times prior thereto extension cords were used as permanent wiring for machines including but not limited to the stretch wrapper.       Note) Certification of corrective action is required for this item.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.305 G01 IV D

Serious Gravity 1 1 instance 6 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.305(g)(1)(iv)(D): Flexible cords and cables were attached to building surfaces:  a) Building 4: On February 9, 2017 and at times prior thereto the extension cord used for permanent wiring for the stretch wrapper was attached to the ceiling beam and wall.    Note) Certification of corrective action is required for this item.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.157 C01

Other-than-serious 1 instance 6 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.157(c)(1): Portable fire extinguishers were not mounted, located and identified so that they were readily accessible to employees without subjecting the employees to possible injury:  a) Building 4: On February 9, 2017 and at times prior thereto clear access to a fire extinguisher was blocked by production materials.  The fire extinguisher was located near the supervisor's office.  Note) Certification of corrective action IS required for this item.