OSHA Inspection: ESCO CONSTRUCTION CO.

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of ESCO CONSTRUCTION CO. in 16235 W. BELLEVIEW AVENUE, MORRISON, CO 80465 (NAICS 238910). OSHA activity number 342290632.

Watch Esco Construction CO. — free Get an email when a new federal OSHA severe-injury report for Esco Construction CO. is published. One employer, no account, unsubscribe in one click.
Site address
16235 W. BELLEVIEW AVENUE
City
MORRISON
State
CO
ZIP
80465
Mailing
6106 S. BROOK FOREST RD., EVERGREEN, CO 80439
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238910
Employees
7
Ownership type
A

5 citations on file for this inspection.

1926.651 H01

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $3802.00 · Current $5000.00
29 CFR 1926.651(h)(1): Employees were working in excavations in which there was accumulated water, or excavations in which water was accumulating, and adequate precautions had not been taken to protect employees against the hazards posed by water accumulation:      a) On or about April 28, 2017 and at times prior, an employee was exposed to serious hazards while working inside a 6 feet 6 inches deep trench. The water was approximately 6 inches deep.
Recent events (2)
  • — I (O) $5000
  • — Z (S) $3802

1926.651 K02

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.651(k)(2): Where the competent person found evidence of a situation that could result in possible cave-in, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions, exposed employee(s) was/were not removed from the hazardous area until the necessary precautions have been taken to ensure their safety:      a) On or about April 28, 2017 and at times prior, an employee was exposed to serious hazards while working inside a trench of approximately 6 feet 6 inches deep. The foreman/competent person did not remove the employee working in the trench. The water inside the trench was approximately 6 inches deep, the bottom of the shield of the trench box was approximately 3 feet 6 inches above the bottom of the trench, and an extension ladder was located outside the trench box.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1926.652 G01 III

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $3802.00 · Current $5000.00
29 CFR 1926.652(g)(1)(iii): Employees were not protected from the hazard of cave-ins when entering or exiting the area protected by shields:      a) On or about April 28, 2017 and at times prior, an employee was exposed to serious hazards while working inside a 6 feet 6 inches deep trench. An extension ladder was located outside the trench box.
Recent events (2)
  • — I (O) $5000
  • — Z (S) $3802

1926.652 G01 IV

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.652(g)(1)(iv): Employees were allowed in shields when shields were being installed, removed, or moved vertically:      a) On or about April 28, 2017 and at times prior, an employee was exposed to serious hazards while working inside a 6 feet 6 inches deep trench. The foreman/competent person had the trench box suspended from the excavator, then lowered the box while the employee was inside.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1926.652 G02

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.652(g)(2): Excavation of material to a level no greater than 2 feet (.61m) below the bottom of a shield system was allowed when there were indications while the trench was open of a possible loss of soil from behind or below the bottom of the shield:      a) On or about April 28, 2017 and at times prior, an employee was exposed to serious hazards while working inside a 6 feet 6 inches deep trench. The foreman/competent person had the bottom of the shield approximately 3 feet 6 inches above the bottom of the trench. The manufacturer's tabulated data of the trench box recommends the bottom of the shield may be a maximum of 2 feet above the bottom of the trench.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

View ESCO CONSTRUCTION CO.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342290632.