WEST SPRINGFIELD, MA —
OSHA Inspection: EZOLD GENERAL CONTRACTING AND CONSTRUCTION MANAGEMENT CO.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of EZOLD GENERAL CONTRACTING AND CONSTRUCTION MANAGEMENT CO. in RIVERDALE ST TO BE MARRIOT COURTYARD HOTEL, WEST SPRINGFIELD, MA 01089 (NAICS 238140). OSHA activity number 342820180.
Where did this inspection happen?
- Site address
- RIVERDALE ST TO BE MARRIOT COURTYARD HOTEL
- City
- WEST SPRINGFIELD
- State
- MA
- ZIP
- 01089
- Mailing
- 103 VERMONT ST., HOLYOKE, MA 01040
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 20
- Ownership type
- A
Citations
2 citations on file for this inspection.
1926.451 E06 I
- Issued
- Abate by
- Penalty
- Initial $3696.00 · Current $1848.00 Reduced
General-duty citation text
29 CFR 1926.451(e)(6)(i): Integral prefabricated scaffold frames were not specifically designed and/or constructed for use as ladder rungs: a) Marriot Courtyard being constructed on Riverdale St., West Springfield, MA: On or about December 6, 2017, an employee was climbing the integral prefabricated scaffold frames which had not been designed for use as ladder rungs by the manufacturer.
Recent events (2)
- — I (S) $1848
- — Z (S) $3696
1926.451 G04 I
- Issued
- Abate by
- Penalty
- Initial $3696.00 · Current $1848.00 Reduced
General-duty citation text
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms: a) Marriot Courtyard being constructed on Riverdale St., West Springfield, MA: On or about December 6, 2017, an employee was working on a scaffold system, more than 10 feet above the ground below that did not have a guardrail system installed that meets the requirements of this subpart.
Recent events (2)
- — I (S) $1848
- — Z (S) $3696
More inspections at EZOLD GENERAL CONTRACTING AND CONSTRUCTION MANAGEMENT CO.
WESTFIELD, MA—2017-10-17 00:00:00
EZOLD GENERAL CONTRACTING AND CONSTRUCTION MANAGEMENT CO.
View EZOLD GENERAL CONTRACTING AND CONSTRUCTION MANAGEMENT CO.'s full OSHA safety record →
More inspections in this industry (NAICS 238140)
MARIANNA, FL—2026-07-13
PRIMETIME MOBILE MASONRY LLC
LOMPOC, CA—2026-07-10
UNKNOWN EMPLOYER
FREEHOLD, NJ—2026-07-10
CRAIG'S MASONRY & HARDSCAPE LLC
CINCINNATI, OH—2026-07-09
ALL AMERICAN CONCRETE LLC
NEW YORK, NY—2026-07-08
JEY CONSTRUCTIONS WORKS CORP
More inspections in MA
WORCESTER, MA—2026-07-10
QUINSIGAMOND COMMUNITY COLLEGE
FITCHBURG, MA—2026-07-10
KELLEY WOOD PRODUCTS, INC.
EVERETT, MA—2026-07-10
HORIZON RETAIL CONSTRUCTION INC
NORTON, MA—2026-07-09
DYNAMIC RESIDENTIAL ROOF MARKETING, LLC
NORTON, MA—2026-07-09
LM GENERAL CONSTRUCTION INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342820180.