Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,645Inspections Most recent open 2026-07-16 Last loaded 2026-07-20

OSHA Inspection: NORTHERN ILLINOIS CONSTRUCTION GROUP, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of NORTHERN ILLINOIS CONSTRUCTION GROUP, INC. in SAVANNA LANE, LOT 57, KILDEER, IL 60010 (NAICS 238140). OSHA activity number 343039244.

Watch Northern Illinois Construction Group, INC. — free Get an email when a new federal OSHA severe-injury report for Northern Illinois Construction Group, INC. is published. One employer, no account, unsubscribe in one click.
Site address
SAVANNA LANE, LOT 57
City
KILDEER
State
IL
ZIP
60010
Mailing
10613 PEBBLE DRIVE, HUNTLEY, IL 60142
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
5
Ownership type
A

7 citations on file for this inspection.

1910.1200 H01

Serious Gravity 5 5 instances 5 exposed
Issued
Abate by
Penalty
Initial $2217.00 · Current $1160.00 Reduced
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area:     29 CFR 1926.59: Note: The requirements applicable to construction work under this section are identical to those set forth at 1910.1200 of this chapter.        a) On or about March 23, 2018, employees were not provided with information and training when required to cut and handle products containing Crystalline Silica, Quartz, and Portland Cement during masonry construction work performed at the site.        In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1160
  • — Z (S) $2217

1926.300 B04 II

Serious Gravity 5 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $2217.00 · Current $1160.00 Reduced
29 CFR 1926.300(b)(4)(ii): The point of operation of machine(s) whose operation exposed an employee to injury was not guarded:           a) On or about March 23, 2018, the cut-off disc on a Makita angle grinder used for grinding masonry products was not guarded.      In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1160
  • — Z (S) $2217

1926.451 E01

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $3880.00 · Current $2060.00 Reduced
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used:     a) On or about March 23, 2018, employees were exposed to the hazard of falling approximately 25 feet where direct access between a scaffold frame and a scaffold platform was obstructed.       In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $2060
  • — Z (S) $3880

1926.451 G01

Serious Gravity 10 2 instances 2 exposed
Issued
Penalty
Initial $3880.00 · Current $2060.00 Reduced
29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section:       a) On or about March 23, 2018, employees were exposed to fall hazards while working from scaffolding at an elevation of approximately 30 feet.         No abatement certification or documentation required for this violation.
Recent events (2)
  • — I (S) $2060
  • — Z (S) $3880

1926.454 A

Serious Gravity 10 5 instances 5 exposed
Issued
Abate by
Penalty
Initial $3880.00 · Current $2060.00 Reduced
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards:     a) On or about March 23, 2018, the employer did not ensure that each employee was provided with training in the recognition and control of the hazards associated with working from scaffolding that was provided for employee use.        In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $2060
  • — Z (S) $3880

1926.454 B

Serious Gravity 10 5 instances 5 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.454(b): The employer did not have each employee involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work in question:     a) On or about March 23, 2018, the employer did not ensure that each employee involved in the erection, disassembling, and moving of scaffolding was provided with training in the recognition of the hazards.     In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.416 E01

Other-than-serious 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.416(e)(1): Worn or frayed electric cords or cables were used:         a) On or about March 23, 2018, worn and frayed electrical cords were used to supply electricity to tools and equipment at the site.          In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).