BIG LAKE, TX —
OSHA Inspection: BIG LAKE GAS PLANT, LP
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of BIG LAKE GAS PLANT, LP in 189 GAS PLANT ROAD, BIG LAKE, TX 76932 (NAICS 211111). OSHA activity number 343334702.
Where did this inspection happen?
- Establishment
- BIG LAKE GAS PLANT, LP
- Site address
- 189 GAS PLANT ROAD
- City
- BIG LAKE
- State
- TX
- ZIP
- 76932
- Mailing
- P.O. BOX 16, BARNHART, TX 76930
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 211111
- Employees
- 16
- Ownership type
- A
Citations
5 citations on file for this inspection.
1910.119 E03 V
- Issued
- Abate by
- Penalty
- Initial $5304.00 · Current $5304.00
General-duty citation text
29 CFR 1910.119(e)(3)(v): The process hazard analysis did not address the hazards related to facility siting: On or about July 26, 2018, at Big Lake Gas Plant, LP located in Big Lake, Texas, employer did not address facility siting in the Process Hazard Analysis (PHA).
Recent events (2)
- — I (S) $5304
- — Z (S) $5304
1910.119 E06
- Issued
- Abate by
- Penalty
- Initial $5304.00 · Current $5304.00
General-duty citation text
29 CFR 1910.119(e)(6): The process hazard analysis was not updated and revalidated every five years: On or about July 26, 2018, at Big Lake Gas Plant, LP located in Big Lake, Texas, the employer had not updated and revalidated the process hazard analysis every five years as required. The last process hazard analysis was conducted in 1996.
Recent events (2)
- — I (S) $5304
- — Z (S) $5304
1910.119 F03
- Issued
- Abate by
- Penalty
- Initial $3031.00 · Current $3035.00
General-duty citation text
29 CFR 1910.119(f)(3): The operating procedures were not reviewed as often as necessary to assure that they reflect current operating practice, including changes that result from changes in process chemicals, technology, and equipment, and changes to facilities. The employer did not annually certify that operating procedures were current and accurate. On or about July 26, 2018, at Big Lake Gas Plant, LP located in Big Lake, Texas, the employer did not annually certify operating procedures to ensure that they are current and accurate. The operating procedures have not been certified since 2000 for operations that included, but not limited to the following: a. Initial startup b. Emergency shutdown, c. Normal shutdown, d. Loading and unloading e. Startup procedures following a turnaround or after emergency shutdown.
Recent events (2)
- — I (S) $3035
- — Z (S) $3031
1910.119 G01 I
- Issued
- Abate by
- Penalty
- Initial $3031.00 · Current $0.00 Reduced
General-duty citation text
29 CFR 1910.119(g)(1)(i): The employer did not train each employee involved in the operating process, in a overview of the process and in the operating procedures as specified in paragraph (f) of 29 CFR 1910.119: On or about July 26, 2018 at Big Lake Gas Plant, LP located in Big Lake, Texas, the employer did not ensure employees engaged in the process operation are trained in the overview of the process and operating procedures including but not limited to the following: a. Initial startup b. Emergency shutdown, c. Normal shutdown, d. Loading and unloading e. Startup procedures following a turnaround or after emergency shutdown.
Recent events (2)
- — I (S) $0
- — Z (S) $3031
1910.119 J02
- Issued
- Abate by
- Penalty
- Initial $5304.00 · Current $5304.00
General-duty citation text
29 CFR 1910.119(j)(2): The employer did not establish or implement written procedures to maintain the on-going integrity of process equipment: On or about July 26, 2018 at Big Lake Gas Plant, LP located in Big Lake, Texas employer failed to establish and implement written mechanical integrity procedures for inspecting and testing the process piping system and for equipment including but not limited to the following: a. The Amine Reboiler, b. The Product Still Reboiler Pump, c. The Demethanizer Reboiler Furnance, d. Refrigerant Storage Tank (32-386) e. Refrigerant Storage Tank (32-387)
Recent events (2)
- — I (O) $5304
- — Z (S) $5304
More inspections at BIG LAKE GAS PLANT, LP
BIG LAKE, TX—2018-04-15 00:00:00
BIG LAKE GAS PLANT, LP
View BIG LAKE GAS PLANT, LP's full OSHA safety record →
More inspections in this industry (NAICS 211111)
MORGANTOWN, WV—2024-08-21 00:00:00
ANDERSON EXCAVATING, LLC
PINEVILLE, NC—2024-03-05 00:00:00
156148 - WESTERN INTERNATIONAL, INC.
SOUTH BEND, IN—2021-10-06 00:00:00
112385 - MERCURIA
GEARY, OK—2021-03-23 00:00:00
DEVON ENERGY CORPORATION
BAKERSFIELD, CA—2021-02-12 00:00:00
CHEVRON U.S.A. INC.
More inspections in TX
RICHMOND, TX—2026-07-17 00:00:00
CORNELIUS NURSERIES, INC.
HOUSTON, TX—2026-07-17 00:00:00
HOLLOWAY HOUSTON, INC.
BONHAM, TX—2026-07-17 00:00:00
VOLUNTARY PURCHASING GROUPS, INC.
SNYDER, TX—2026-07-16 00:00:00
RNWBL
WICHITA FALLS, TX—2026-07-16 00:00:00
UNITED RENTALS, INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343334702.