EL PASO, TX —
OSHA Inspection: WESTERN REFINING COMPANY, L.P.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of WESTERN REFINING COMPANY, L.P. in 6501 TROWBRIDGE DRIVE, EL PASO, TX 79905 (NAICS 324110). OSHA activity number 343784831.
Where did this inspection happen?
- Establishment
- WESTERN REFINING COMPANY, L.P.
- Site address
- 6501 TROWBRIDGE DRIVE
- City
- EL PASO
- State
- TX
- ZIP
- 79905
- Mailing
- 212 N. CLARK STREET, EL PASO, TX 79905
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 324110
- Employees
- 409
- Ownership type
- A
Citations
6 citations on file for this inspection.
1910.119 F01
- Issued
- Abate by
- Penalty
- Initial $9472.00 · Current $0.00 Reduced
General-duty citation text
29 CFR 1910.119(f)(1): The employer did not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and shall address at least the following elements. On or about February 12, 2019 at the El Paso Western Refining Facility, the employer did not develop and implement a written operating procedure for: a) Taking spent catalyst samples. b) Safely conducting activities with tanks listed as Intercat Main Catalyst Feed Tank (F-353), Olefin Additive tank (F-354) and Co-Promotor Additive Tank (F-355).
Recent events (2)
- — I (S) $0
- — Z (S) $9472
1910.119 J02
- Issued
- Abate by
- Penalty
- Initial $13260.00 · Current $13260.00
General-duty citation text
29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going integrity of process equipment. On or about February 12, 2019 at the El Paso Western Refining Facility, the employer failed to ensure that written procedures for testing interlocks were established and implemented such as but not limited to: a) Interlock INT 301-5 Spent Cat Slide Valve Low Differential Shutdown (P&ID 300-011-10025-817 Rev.12). b) Interlock INT 301-2 Low Air Flow to Regenerator Heater H-3000 (P&ID 300-011-10025-811 Rev.11).
Recent events (2)
- — I (O) $13260
- — Z (S) $13260
1910.119 J04 I
- Issued
- Abate by
- Penalty
- Initial $13260.00 · Current $13260.00
General-duty citation text
29 CFR 1910.119(j)(4)(i): The employer did not perform inspections and tests on process equipment. On or about February 12,2019 at the El Paso Western Refining Facility, the employer did not perform inspections and testing on the following process equipment: a) Intercat Main Catalyst Feed Tank (F-353). b) Pressure Safety Valve PVS- W16233 located on the top of the Intercat Main Catalyst Feed Tank (F-353). c) Interlocks: 1. Interlock INT 301-5 Spent Cat Slide Valve Low Differential Shutdown (P&ID 300-011-10025-817 Rev.12). 2. Interlock INT 301-2 Low Air Flow to Regenerator Heater H-3000 (P&ID 300-011-10025-811 Rev.11). d) Controls and Indicators: 1. Level Control LC-258 (P&ID 300-011-10025-817 Rev.12). 2. Differential Pressure Indication PDI-225 (P&ID 300-011-10025-817 Rev.12). 3. Temperature Control TC-178 (P&ID 300-011-10025-811 Rev.11). 4. Fire Eyes BA-300A (P&ID 300-011-10025-811 Rev.11).
Recent events (2)
- — I (O) $13260
- — Z (S) $13260
1910.119 D03 I B
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.119(d)(3)(i)(B): The employer's piping and instrument diagrams were not accurate. On or about February 12, 2019 at El Paso Western Refining Facility, the employer did not ensure that piping and instrument diagrams (P&IDs) were accurate. The P&IDs were not updated and accurate for the following: a) P&ID 300-011-10025-810 Rev. 15, did not include the Fresh Cat Loader, Diesel Compressor, Drier Skids, Boiler House, FCC Loop, and Intercat Additive. b) P&ID 130-011-10025-830 Rev. 13, did not include the Chemical Injection Point. c) P&ID 300-011-10025-V01 Rev. 02, did not include line connecting tanks F-354 and F-355 to the process.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.134 H03 IV B
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.134(h)(3)(iv)(B): Certification information on a tag or label was not attached to the storage compartment for the respirator and kept with the respirator or included in inspection reports stored as paper or electronic files: On or about February 12, 2019 at the El Paso Western Refining Facility, the employer did not ensure that inspection reports for emergency Self-Contained Breathing Apparatus (SCBAs) were attached by paper or electronic files for the following: a) Station #5 (1011737). b) Station #6 (1011745). c) Station #7 (1011757).
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.146 C02
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.146(c)(2): If the workplace contains permit spaces, the employer did not inform exposed employees, by posting danger signs or by any other equally effective means, of the existence and location of and the danger posed by the permit spaces. On or about February 12, 2019 at the El Paso Western Refining Facility, the employer did not inform employees by posting danger signs or by any other equally effective means at locations containing permit spaces for the following: a) LCO Stripper (F-1301) skirt in the Fluidized Catalyst Cracking Unit (FCCU). b) Off Gas Amine Column (F-1311) skirt in the FCCU. c) Second stage reactor (F-8906) skirt in the Catalyst Gasoline Hydrotreater (CGHT). d) Vessel F-8140 skirt in the Alkylation unit.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at WESTERN REFINING COMPANY, L.P.
EL PASO, TX—2010-07-16 00:00:00
WESTERN REFINING COMPANY, L.P.
TUCSON, AZ—2009-09-23 00:00:00
WESTERN REFINING COMPANY, L.P.
View WESTERN REFINING COMPANY, L.P.'s full OSHA safety record →
More inspections in this industry (NAICS 324110)
TORRANCE, CA—2026-07-15
TORRANCE REFINING COMPANY LLC
EL SEGUNDO, CA—2026-06-30
CHEVRON U.S.A. INC.
EL SEGUNDO, CA—2026-06-30
CHEVRON U.S.A. INC.
TRAINER, PA—2026-06-26
MONROE ENERGY, LLC
RICHMOND, CA—2026-06-17
CHEVRON U.S.A. INC.
More inspections in TX
WICHITA FALLS, TX—2026-07-16
UNITED RENTALS, INC.
SAN MARCOS, TX—2026-07-16
CASA MECHANICAL SERVICES, LTD.
CLARKSVILLE, TX—2026-07-15
SEQUOIAS TREE EXPERT LLC
EL PASO, TX—2026-07-15
SURE STEEL
CORPUS CHRISTI, TX—2026-07-15
NORTH STAR ENERGY SOLUTIONS LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343784831.