1,224,460Inspections Most recent open 2026-07-13 Last loaded 2026-07-16
Safety Incidents OSHA Severe Injury Reports · 2015–2025

OSHA Inspection: ER SNELL CONTRACTOR, INC.

Complaint inspection · Health discipline

On , OSHA opened a complaint health inspection of ER SNELL CONTRACTOR, INC. in 5601 COLUMBIA RAOD, GROVETOWN, GA 30813 (NAICS 324121). OSHA activity number 343947339.

Watch ER Snell Contractor, INC. — free Get an email when a new federal OSHA severe-injury report for ER Snell Contractor, INC. is published. One employer, no account, unsubscribe in one click.
Site address
5601 COLUMBIA RAOD
City
GROVETOWN
State
GA
ZIP
30813
Mailing
5102 PIERCE CT, EVANS, GA 30809
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
324121
Employees
4
Ownership type
A

5 citations on file for this inspection.

1910.134 E01

Other-than-serious 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $4831.00 · Current $3000.00 Reduced
29 CFR 1910.134(e)(1): The employer did not provide a medical evaluation to determine the employee's ability to use a respirator, before the employee was fit tested or required to use the respirator in the workplace:  Note:  The employer may discontinue an employee's medical evaluations when the employee is no longer required to use a respirator.    ER Snell Contractor, Inc., Grovetown, GA - At the asphalt plant, employees were expected to use an N95 disposable dust respirator during cleaning and working near the hydrated lime. A medical evaluation was not performed prior to requiring employees to wear a respirator, on or about 4/18/19.
Recent events (2)
  • — I (O) $3000
  • — Z (S) $4831

1910.134 F01

Other-than-serious 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.134(f)(1): The employer did not ensure that employee(s) required to use a tight-fitting facepiece respirator passed the appropriate qualitative fit test (QLFT) or quantitative fit test (QNFT):    ER Snell Contractor, Inc., Grovetown, GA - At the asphalt plant, employees were expected to use an N95 disposable dust respirator during cleaning and working near the hydrated lime. A fit test was not conducted prior to requiring employees to wear a respirator, on or about 4/18/19.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1910.134 K01

Other-than-serious 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.134(k)(1): The employer did not provide effective training to ensure that each employee could demonstrate knowledge of 1910.134(k)(1)(i) - (vii):  a) Why the respirator is necessary and how improper fit, usage, or maintenance can compromise the protective effect of the respirator;  b) What the limitations and capabilities of the respirator are;  c) How to use the respirator effectively in emergency situations, including situations in which the respirator malfunctions;  d) How to inspect, put on and remove, use, and check the seals of the respirator;  e) What the procedures are for maintenance and storage of the respirator; and  f) How to recognize medical signs and symptoms that may limit or prevent the effective use of respirators.    ER Snell Contractor, Inc., Grovetown, GA - At the asphalt plant, employees were expected to use an N95 disposable dust respirator during cleaning and working near the hydrated lime. Training in accordance with the standard was not provided prior to requiring employees to wear a respirator, on or about 4/18/19.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1910.146 C02

Serious Gravity 5 1 instance 3 exposed
Issued
Penalty
Initial $6440.00 · Current $4000.00 Reduced
29 CFR 1910.146(c)(2): The employer did not inform exposed employees, by posting danger signs or by any other equally effective means, of the existence and location of and the danger posed by the permit spaces:    ER Snell Contractor, Inc., Grovetown, GA - At the asphalt plant, the silos and drum were not identified as permit confined spaces, on or about 4/18/19.
Recent events (2)
  • — I (S) $4000
  • — Z (S) $6440

1910.1053 D03 I

Other-than-serious 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $8051.00 · Current $5000.00 Reduced

Hazardous substances 9000

29 CFR 1910.1053(d)(3)(i): The employer did not perform initial monitoring to assess the 8-hour TWA exposure for each employee on the basis of one or more personal breathing zone air samples that reflect the exposures of employees on each shift, for each job classification, in each work area:    ER Snell Contractor, Inc., Grovetown, GA - At the asphalt plant, employees were potentially exposed to silica dust during cleaning. Initial monitoring to determine the exposure to silica was not performed, on or about 4/18/19.
Recent events (2)
  • — I (O) $5000
  • — Z (S) $8051

View ER SNELL CONTRACTOR, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343947339.