OSHA Inspection: YIREH CONSTRUCTION, LLC

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of YIREH CONSTRUCTION, LLC in 310 CHESTNUT STREET, READING, PA 19611 (NAICS 238160). OSHA activity number 344274279.

Watch Yireh Construction, LLC — free Get an email when a new federal OSHA severe-injury report for Yireh Construction, LLC is published. One employer, no account, unsubscribe in one click.
Site address
310 CHESTNUT STREET
City
READING
State
PA
ZIP
19611
Mailing
804 ELM STREET, READING, PA 19601
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
4
Ownership type
A

4 citations on file for this inspection.

1903.19 C01

Other-than-serious 3 instances 6 exposed
Issued
Abate by
Penalty
Initial $319.00 · Current $0.00 Reduced
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated:    (a) Location - Facility    On or about October 28, 2019, the employer did not provide abatement documentation or certification within 10 calendar days of the abatement date.      Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (O) $0
  • — Z (O) $319

1926.102 A01

Serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $1705.00 · Current $1000.00 Reduced
29 CFR 1926.102(a)(1): Employees were not provided with eye and face protection equipment when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents:    a) 310 Chestnut Street, Reading PA - An employee was not provided with eye protection while operating a pneumatic nail gun to attach shingles to a roof and was exposed to possible ricochet nails, on or about August 30, 2019.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $1000
  • — Z (S) $1705

1926.501 B13

Serious Gravity 10 2 instances 4 exposed
Issued
Abate by
Penalty
Initial $3978.00 · Current $3000.00 Reduced
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501(b):     a) 310 Chestnut Street, Reading PA - Employees performing roofing operations on a steep residential roof were not protected from fall hazards up to approximately 28 feet high to the ground below, on or about August 30, 2019.    b) 310 Chestnut Street, Reading PA - Employees were not provided fall protection while accessing a steep roof from a lower level flat roof and were exposed to an approximate 20 foot high fall hazard to the ground below, on or about August 30, 2019.    Abatement certification and documentation required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $3000
  • — Z (S) $3978

1926.503 B01

Serious Gravity 10 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.503(b)(1): The employer did not verify compliance with paragraph (a) of this section (fall protection training) by preparing a written certification record which contained the name or other identity of the employee trained, the date(s) of the training, and the signature of the person who conducted the training or the signature of the employer:  a) 310 Chestnut Street, Reading PA - The employer did not prepare a written certification verifying that employees had been trained in hazards related to falls from elevation, on or about August 30, 2019.  Abatement certification and documentation required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0