OSHA Inspection: WILLIAM N. LAMARRE CONCRETE PRODUCTS

Complaint inspection · Health discipline

On , OSHA opened a complaint health inspection of WILLIAM N. LAMARRE CONCRETE PRODUCTS in 87 ADAMS HILL RD, GREENVILLE, NH 03048 (NAICS 327390). OSHA activity number 344336094.

Watch William N. Lamarre Concrete Products — free Get an email when a new federal OSHA severe-injury report for William N. Lamarre Concrete Products is published. One employer, no account, unsubscribe in one click.
Site address
87 ADAMS HILL RD
City
GREENVILLE
State
NH
ZIP
03048
Mailing
PO BOX 333, GREENVILLE, NH 03048
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
327390
Employees
28
Ownership type
A

9 citations on file for this inspection.

1910.107 C06

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $5834.00 · Current $2917.00 Reduced
29 CFR 1910.107(c)(6): Electrical wiring and equipment not subject to deposits of combustible residues but located in a spraying area as herein defined were not explosion-proof type approved for Class I, group D locations and did not otherwise conform to the provisions of subpart S of this part, for Class I, Division 1, Hazardous Locations:    a. Paint building - On or about September 25, 2019, an employee sprayed a crane truck with 5star Xtreme Original Klearkote 5185 and 5star Xtreme Original Hardener 5187 within a close vicinity of electric switches, outlets, conduit, lights, and circuit breaker panels which were not approved for use in Class I, Division 1 hazardous locations.  Employees were exposed to fire hazards.
Recent events (2)
  • — I (S) $2917
  • — Z (S) $5834

1910.107 D02

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $7293.00 · Current $3647.00 Reduced
29 CFR 1910.107(d)(2): Spraying area(s) were not provided with mechanical ventilation adequate to remove flammable vapors, mists or powders to a safe location and to confine and control combustible residues:    a. Paint building - On or about September 25, 2019, an employee sprayed a crane truck with 5star Xtreme Original Klearkote 5185 and 5star Xtreme Original Hardener 5187, and the area was not provided with mechanical ventilation.  Employees were exposed to inhalation and fire hazards.
Recent events (2)
  • — I (S) $3646.5
  • — Z (S) $7293

1910.134 C01

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $7293.00 · Current $3647.00 Reduced
29 CFR 1910.134(c)(1): A written respiratory protection program that included the provisions in 29 CFR 1910.134(c)(1)(i) - (ix) with worksite specific procedures was not established and implemented for required respirator use:    a. Painting Building - On or about September 25, 2019, an employee was wearing a half face air purifying respirator while spray finishing a crane truck, and the employer did not ensure that an effective respiratory protection program was established.  There was no written program covering respirator selection, fit-testing, medical clearance, storage/cleaning, and training requirements.
Recent events (2)
  • — I (S) $3646.5
  • — Z (S) $7293

1910.134 D01 III

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.134(d)(1)(iii): The employer did not identify and evaluate the respiratory hazard(s) in the workplace; including a reasonable estimate of employee exposures to respiratory hazards and identification of the contaminant's chemical state and physical form:  a. Painting Building - On or about September 25, 2019, an employee was wearing a half face air purifying respirator while spray finishing a crane truck, and the employer did not identify and evaluate exposure to airborne components of Omni MBC1 paint, Xtreme Hardener 5187, and Xtreme Klearkote 5185.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.134 E01

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.134(e)(1): The employer did not provide a medical evaluation to determine the employee's ability to use a respirator, before the employee was fit tested or required to use the respirator in the workplace:  a. Painting Building - On or about September 25, 2019, an employee was wearing a half face air purifying respirator while spray finishing a crane truck, and the employer did not provide a medical evaluation.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.134 F01

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.134(f)(1): The employer did not ensure that employee(s) required to use a tight-fitting facepiece respirator passed the appropriate qualitative fit test (QLFT) or quantitative fit test (QNFT):  a. Painting Building - On or about September 25, 2019, an employee was wearing a half face air purifying respirator while spray finishing a crane truck, and the employer did not ensure that the employee had passed a fit test.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.134 K

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.134(k): The employer did not provide comprehensive, understandable training which did not occur annually and/or more often if necessary:  a. Painting Building - On or about September 25, 2019, an employee was wearing a half face air purifying respirator while spray finishing a crane truck, and the employer did not provide respirator training.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.1200 G01

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $7293.00 · Current $3647.00 Reduced
29 CFR 1910.1200(g)(1): The employer did not have a safety data sheet in the workplace for each hazardous chemical which the employees used:    a. Painting Building - On or about September 25, 2019, an employee spray finishing a crane truck with Omni MBC1 paint, Xtreme Klearkote 5185, and Xtreme Hardener 5187 which contained homopolymer of HDI and n-butyl acetate, and the employer did not have safety data sheets available.
Recent events (2)
  • — I (S) $3646.5
  • — Z (S) $7293

1910.157 E03

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.157(e)(3): Portable fire extinguishers were not subjected to an annual maintenance check:  a. Painting Building - On or about September 25, 2019, a fire extinguisher was overdue for the annual maintenance check. It was due in July 2017.